Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> E. The Contractor shall lay out and install his work in advance of pouring concrete floors or walls. He <br /> shall furnish all sleeves to the General Contractor for openings through poured masonry floors or <br /> walls, above grade, required for passage of all conduits, pipes, or ducts installed by him. The <br /> Contractor shall provide all inserts and hangers required to support his equipment. <br /> 3.03 PERFORMANCE <br /> A. The Contractor shall perform all excavation and backfill operations necessary for installation of his <br /> work. <br /> 3.04 ERECTION <br /> A. All support steel, angles, channels, pipes or structural steel stands and anchoring devices that may <br /> be required to rigidly support or anchor material and equipment shall be provided by this <br /> Contractor. <br /> 3.05 FIELD QUALITY CONTROL <br /> A. The Contractor shall conform to the requirements of Division 3 for concrete testing. <br /> B. All testing required for compliance with the Contract shall be as stated in subsequent sections. <br /> 3.06 ADJUST AND CLEAN <br /> A. All equipment and installed materials shall be thoroughly clean and free of all dirt, oil, grit, grease, <br /> etc. <br /> B. Factory painted equipment shall not be repainted unless damaged areas exist. These areas shall <br /> be touched up with a material suitable for intended service. In no event shall name plates be <br /> painted. <br /> C. At a scheduled meeting, the Contractor shall instruct the Owner or the Owner's representative in <br /> the operation and maintenance of all equipment installed under his Contract(in the presence of the <br /> Engineer). <br /> D. Equipment with filter media shall be run for a period of two (2)weeks after completion of work at <br /> which time a new filter media shall be installed with one change of filter media provided the Owner <br /> for future replacement. (Provide a total of three (3)sets). <br /> E. The Contractor shall adjust the tension on all belts six months after the final inspection. <br /> 3.07 MAINTENANCE AND OPERATING MANUAL <br /> A. The Contractor shall prepare a PDF version of the manual describing the proper maintenance and <br /> system operation. This manual shall not consist of standard factory printed data intended for <br /> dimension or design purposes (although these may be included), but shall be prepared to describe <br /> this particular job. This manual shall include the following: <br /> 1. A check list for periodic maintenance of all equipment. <br /> 2. Suggested setting of all controls and switches for normal operation, with description of control <br /> and its location. <br /> 3. A check list for seasonal shutdown. <br /> 4. Maintenance and spare parts data for each major piece of equipment. <br /> 5. As-built wiring, interlock and control diagrams for equipment with color coding shown on <br /> wiring and interlock diagrams. <br /> 6. Air and Water Balance Report. <br /> B. The PDF shall be indexed, bookmarked, dated and signed by the Contractor when completed. <br /> C. The operating and maintenance manuals shall be submitted to the Engineer for approval. When <br /> the manuals are considered complete by the Engineer, they will be turned over to the Owner for <br /> their permanent use. <br /> END OF SECTION 23 01 00 <br /> PDC Project 18102 HVAC GENERAL PROVISIONS 2301 00 -4 <br /> 12/17/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.