Orange County NC Website
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> B. The Contractor shall protect all material and equipment from breakage, theft, or weather damage. <br /> No material or equipment shall be stored on the ground. <br /> C. The material and equipment shall remain the property of the Contractor until the project has been <br /> completed and turned over to the Owner. <br /> 1.06 WORK CONDITIONS AND COORDINATION <br /> A. The Contractor shall review the electrical plans to establish points of connection and the extent of <br /> electrical work to be provided in his Contract. All electrical work shall be performed by a licensed <br /> electrical contracting firm. <br /> B. This Contractor shall be responsible for the final electrical connections to all equipment installed as <br /> part of his contract. Unless otherwise noted, this Contractor shall wire from his equipment to <br /> disconnect switches,junction boxes, or panelboard circuit breakers as provided by the Electrical <br /> Contractor. <br /> C. Electrical work shall be in accordance with all local, state and national codes and as specified in <br /> Division 26. <br /> D. Pipe, conduit and duct chases required for installation of work shall be provided by the General <br /> Contractor unless otherwise noted. This Contractor shall be responsible for coordinating the <br /> location of all required chases. <br /> E. All work shall be coordinated with other trades. Cutting of new work and subsequent patching shall <br /> be at the Contractor's expense at no extra cost to the Owner. <br /> 1.07 GUARANTEE <br /> A. See the General and Supplementary General Conditions <br /> B. Where extended warranties or guarantees are available from the manufacturer, the Contractor <br /> shall prepare the necessary contract documents to validate these warranties as required by the <br /> manufacturer and present them to the Arch itect/Engineer. <br /> C. The Contractor shall include in his bid a full warranty and guarantee for a five (5)year period on the <br /> compressors for the refrigeration equipment, including all chillers. This warranty does not include <br /> labor following the first year's Labor and Material Warranty. <br /> PART 2 PRODUCT <br /> 2.01 GENERAL REQUIREMENTS <br /> A. Materials and equipment shall be new, unless noted otherwise, of the highest grade and quality and <br /> free from defects or other imperfections. Materials and equipment found defective shall be <br /> removed and replaced at the contractor's expense. <br /> B. The contractor shall provide name plates for identification of all equipment, switches, panels, etc. <br /> C. The name plates shall be laminated phenolic plastic, black front and back with white core, white <br /> engraved letters (1/4" minimum) etched into the white core. Name plates shall be fastened with <br /> sheet metal screws. <br /> PART 3 EXECUTION <br /> 3.01 INSPECTION <br /> A. This Contractor shall examine the areas of completed work and shall insure that no defects or <br /> errors are present which would result in the poor application or installation of subsequent work. <br /> 3.02 INSTALLATION <br /> A. All work shall be performed in a manner indicating proficiency in the trade. <br /> B. All conduit, pipes, ducts, etc. shall be either parallel to building walls or plumb where installed in a <br /> vertical position and shall be concealed when located in architecturally finished areas. <br /> C. Any cutting or patching required for installation of this Contractor's work shall be kept to a <br /> minimum. Written approval shall be required by the Architect/Engineer if cutting of primary <br /> structure is involved. <br /> D. All patching shall be done in such a manner as to restore the areas or surfaces to match existing <br /> finishes. <br /> PDC Project 18102 HVAC GENERAL PROVISIONS 2301 00 - 3 <br /> 12/17/2018 <br />