Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:B94F2D40-3B3C-47A7-86C2-6F1B4F92C62C <br /> ESG Mvironmeniai 301unons urvup <br /> Leading people,companies and communities to live, Report with Protocols for R e m e d i a t i o n <br /> work and prosper in a sustainable environment. <br /> P5- View of the moisture damage below one <br /> of the windows. This conditional was <br /> observed on most of the windows in the <br /> building. <br /> P6- View of the 2nd level elevator lobby area <br /> Mi LI <br /> where a large amount of wet drywall was <br /> g rY�' <br /> identified (shown by yellow outline). <br /> P6- View contents at the right section of the <br /> warehouse where suspect microbial growth <br /> was observed. This conditional was <br /> observed on a small portion of the <br /> warehouse contents, which indicated that the <br /> elevated humidity in the warehouse was <br /> creating conditions capable of allowing <br /> microbial growth on some surfaces. <br /> P6- View of the exterior front of the <br /> building where moisture stains were <br /> •�— observed below the window (circled in <br /> yellow). Additional signs of discoloration <br /> likely due to moisture were observed at the <br /> exterior. <br /> Environmental Solutions Group • 1000 N. Elm St., Greensboro, NC 27401 • 336-373-1538 • www.Go-ESG.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.