Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 09 68 13—TILE CARPETING <br /> a. Rating: 3.5 kV when tested at 20% R.H/70 deg F. <br /> b. Test Method: AATCC 134. <br /> D. Certification: Submit manufacturer's certificate stating that materials furnished comply with specified requirements. <br /> Include supporting certified laboratory testing data indicating that material meets specified test requirements. <br /> 1.7 DELIVERY, STORAGE AND HANDLING <br /> A. Deliver materials to project site in original factory wrappings and containers, clearly labeled with identification of <br /> manufacturer, brand name, quality or grade, fire hazard classification, and lot number. Store materials in original <br /> undamaged packages and containers, inside wall-ventilated area protected from weather, moisture, soiling, <br /> extreme temperatures, humidity; laid flat, blocked off ground to prevent sagging and warping. Maintain <br /> temperature in storage area above 40 degrees Fahrenheit. <br /> B. Comply with instructions and recommendations of manufacturer for special delivery, storage and handling <br /> requirements. <br /> 1.8 SEQUENCING AND SCHEDULING <br /> A. Sequence carpet installation with other work to minimize possibility of damage and soiling during remainder of <br /> construction period. <br /> 1.9 WARRANTY <br /> A. Special Wear Warranty: Submit a written warranty, executed by the Contractor, Installer, and the Manufacturer, <br /> agreeing to repair or replace carpeting which fails in materials or workmanship within the specified warranty <br /> period. this warranty shall be in addition to and not a limitation of other rights the Owner may have against the <br /> Contractor under the Contract Documents. <br /> B. Warranty period is 15 years after date of Project Acceptance. <br /> C. Warranty must be non-prorated. Lifetime warranty will not be accepted. <br /> D. Chair pads are not required for carpet warranty coverage. <br /> 1.10 MAINTENANCE <br /> A. Maintenance Instructions: Submit manufacturer's printed instructions for maintenance of installed work, including <br /> methods and frequency recommended for maintaining optimum condition under anticipated traffic and use <br /> conditions. Include precautions against materials and methods which may be detrimental to finishes and <br /> performance. <br /> B. Replacement Materials: After completion of work, deliver not less than 2% of each type, color, and pattern of <br /> carpeting, exclusive of material required to properly complete installation. Furnish accessory components as <br /> required. Furnish replacement materials from same production run as materials installed. Package replacement <br /> materials with protective covering, identified with appropriate labels. <br /> 1.11 EXTRA MATERIALS <br /> A. Furnish extra materials described below, before installation begins, from the same manufactured lot packaged for <br /> storage and identified with labels describing contents. Provide tiles equal to 5% of the quantity installed for each <br /> type indicated but not less than 10 square yards. <br /> PART 2-PRODUCTS <br /> 2.1 MANUFACTURER <br /> A. The following manufacturers and carpet series will be accepted if manufactured in accordance with physical <br /> properties,fire performance characteristics, and construction requirements specified herein. <br /> B. Provide the following for CPT <br /> 1. Manufacturer: Mohawk Industries. <br /> a. Ecoshpere Tile GT333; Color TBD. <br /> 2. Approved equals. Must meet the RH adhesive specified. <br /> C. Provide the following for Anti Static CPT <br /> 1. Manufacturer: StaticSmart <br /> a. StaticSmart Plus, Colonial, Color TBD. <br /> ©BOOMERANG DESIGN 1835 09 68 13-2 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.