Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 09 65 13 -RESILIENT WALL BASE AND ACCESSORIES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes the following: <br /> 1. Resilient wall base. <br /> 2. Resilient flooring accessories. <br /> 3. Resilient carpet accessories. <br /> 1.2 SUBMITTALS <br /> A. Samples for Initial Selection: Manufacturer's standard sample sets consisting of sections of units showing the full <br /> range of colors and patterns available for each type of product indicated. <br /> B. Samples for Verification: In manufacturer's standard sizes, but not less than 12 inches long, of each product color <br /> and pattern specified. <br /> 1.3 QUALITY ASSURANCE <br /> A. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in <br /> installing resilient products similar to those required for this Project and with a record of successful in-service <br /> performance. <br /> B. Source Limitations: Obtain each type and color of product specified from one source with resources to provide <br /> products of consistent quality in appearance and physical properties without delaying the Work. <br /> C. Fire-Test-Response Characteristics: Provide products with the following fire-test-response characteristics as <br /> determined by testing identical products per test method indicated below by a testing and inspecting agency <br /> acceptable to authorities having jurisdiction. <br /> 1. Critical Radiant Flux: 0.45 W/sq. cm or greater when tested per ASTM E 648. <br /> 2. Smoke Density: Maximum specific optical density of 450 or less when tested per ASTM E 662. <br /> 1.4 DELIVERY, STORAGE,AND HANDLING <br /> A. Deliver products to Project site in manufacturer's original, unopened cartons and containers, each bearing names of <br /> product and manufacturer, Project identification, and shipping and handling instructions. <br /> B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and <br /> 90 deg F. <br /> C. Move products into spaces where they will be installed at least 48 hours before installation, unless longer <br /> conditioning period is recommended in writing by manufacturer. <br /> 1.5 PROJECT CONDITIONS <br /> A. Maintain a temperature of not less than 70 deg F or more than 95 deg F in spaces to receive resilient products for <br /> at least 48 hours before installation, during installation, and for at least 48 hours after installation, unless <br /> manufacturer's written recommendations specify longer time periods. After postinstallation period, maintain a <br /> temperature of not less than 55 deg F or more than 95 deg F. <br /> B. Do not install products until they are at the same temperature as the space where they are to be installed. <br /> C. For resilient products installed on traffic surfaces, close spaces to traffic during installation and for time period after <br /> installation recommended in writing by manufacturer. <br /> D. Coordinate resilient product installation with other construction to minimize possibility of damage and soiling during <br /> remainder of construction period. Install resilient products after other finishing operations, including painting, have <br /> been completed. <br /> 1.6 EXTRA MATERIALS <br /> A. Provide minimum of 60 linear feet in a continuous coil. <br /> PART 2-PRODUCTS <br /> 2.1 MANUFACTURERS <br /> A. Products: Subject to compliance with requirements, provide one of the products indicated for each designation in <br /> the Resilient Wall Base and Accessory Schedule at the end of Part 3. <br /> ©BOOMERANG DESIGN#1835 09 65 13-1 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 11/15/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.