Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 07 19 00 -WATER REPELLANTS <br /> B. System Type: Silane-Siloxane,water-based, anti-microbial, shall be one of the following. <br /> 1. Basis of Design: Kleer-O-SealTm High Performance Hydrophobic Silane Sealer by Imco Technologies, 1-877- <br /> 957-4626,www.imcotechnologies.com. or approved equal. <br /> 2. Or equal product approved by Owner and Architect. <br /> PART 3 -EXECUTION <br /> 3.1 Preparation <br /> A. Remove all existing coatings, prepare concrete surfaces in accordance with manufacturer's instructions, SSPC-SP <br /> 13/NACE 6, and ICRI. <br /> B. Ensure surfaces are clean, dry, and free of oil, grease, dirt, dust, and other contaminants. <br /> C. Allow new mortar to cure for a minimum of 28 days before coating. <br /> D. Level protrusions and mortar spatter. <br /> 3.2 Protection of Surfaces Not Scheduled To Be Coated <br /> A. Protect surrounding areas and surfaces not scheduled to be coated from damage during surface preparation and <br /> application of coatings. <br /> B. Protect shrubs, metal, glass, concrete, asphalt and other building hardware during application from over-spray. <br /> C. Immediately remove coatings that fall on surrounding areas and surfaces not scheduled to be coated. <br /> 3.3 Water Repellant Coating Application <br /> A. Do not apply if rain is eminent. <br /> B. Install one coat of water repellant coating according to manufacturer's requirements. <br /> C. Apply material as shipped by the manufacturer. Do not dilute or thin. <br /> D. Keep containers closed when not in use to avoid contamination. <br /> E. Use application equipment,tools, pressure settings, and techniques in accordance with manufacturer's instructions. <br /> 3.4 Repair <br /> A. Materials and Surfaces Not Scheduled to Be Coated: Repair or replace damaged materials and surfaces not <br /> scheduled to be coated. <br /> 3.5 Cleaning <br /> A. Remove temporary coverings and protection of surrounding areas and surfaces. <br /> END OF SECTION 07 19 00 <br /> ©BOOMERANG DESIGN 07 19 00-2 510 Meadowlands Drive,Hillsborough,NC <br /> BD#1835 ORANGE COUNTY, NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.