Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 04 01 20.63 —BRICK MASONRY REPAIR <br /> SECTION 04 01 20.63 -BRICK MASONRY REPAIR <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 <br /> Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section Includes: <br /> 1. Repairing brick masonry. <br /> 2. Removing abandoned anchors. <br /> 3. Painting steel uncovered during the work. <br /> B. Related Requirements: <br /> 1. Section 01 35 16 "Alteration Project Procedures" for general remodeling, renovation, repair, and maintenance <br /> requirements. <br /> 1.3 ALLOWANCES <br /> A. Allowances for brick masonry repair are specified in Section 01 21 00"Allowances." <br /> B. Preconstruction testing is part of testing and inspecting allowance. <br /> C. Abandoned anchor removal is part of<Insert name of allowance>. <br /> D. Brick removal and replacement is part of brick removal and replacement allowance. <br /> E. Patching brick masonry is part of masonry patching allowance. <br /> 1.4 UNIT PRICES <br /> A. Work of this Section is affected by unit prices specified in Section 01 22 00"Unit Prices." <br /> 1. Unit prices apply to authorized work covered by[quantity allowances] [estimated quantities]. <br /> 2. Unit prices apply to additions to and deletions from Work as authorized by Change Orders. <br /> 1.5 DEFINITIONS <br /> A. Low-Pressure Spray: [100 to 400 psi (690 to 2750 kPa); 4 to 6 gpm (0.25 to 0.4 L/s)] <Insert range of values>. <br /> B. Rebuilding (Setting) Mortar: Mortar used to set and anchor masonry in a structure, distinct from pointing mortar <br /> installed after masonry is set in place. <br /> C. Saturation Coefficient: Ratio of the weight of water absorbed during immersion in cold water to weight absorbed <br /> during immersion in boiling water; used as an indication of resistance of bricks to freezing and thawing. <br /> 1.6 PREINSTALLATION MEETINGS <br /> A. Preinstallation Conference: Conduct conference at[Project site]<Insert location>. <br /> 1. Review methods and procedures related to brick masonry repair including, but not limited to,the following: <br /> a. Verify brick masonry repair specialist's personnel, equipment, and facilities needed to make progress and <br /> avoid delays. <br /> b. Materials, material application, sequencing, tolerances, and required clearances. <br /> c. Quality-control program. <br /> d. Coordination with building occupants. <br /> e. <Insert agenda items>. <br /> 1.7 SEQUENCING AND SCHEDULING <br /> A. Order sand [and gray portland cement] for colored mortar immediately after approval of [Samples] [mockups]. <br /> Take delivery of and store at Project site enough quantity to complete Project. <br /> B. Work Sequence: Perform brick masonry repair work in the following sequence, which includes work specified in this <br /> and other Sections: <br /> 1. 07 54 00—Single-Ply Roof Reparis <br /> 2. 07 41 10—Metal Roof Repairs <br /> 3. 07 19 00—Water Repellants <br /> 4. 04 01 20—Masonry Restoration <br /> 5. 04 00 20—Preparation for Masonry Restoration <br /> 6. 07 92 00—Elastomeric Joint Sealants <br /> 7. Remove plant growth. <br /> ©BOOMERANG DESIGN 04 01 20.63-1 510 Meadowlands Drive,Hillsborough, NC <br /> BD#1835 ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.