Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 04 01 20-MASONRY RESTORATION <br /> 1. Mask or otherwise protect windows,doors,ornamental trim,glass,wood,limestone and cast stone surfaces from <br /> cleaning chemicals. <br /> 2. At least two hours prior to cleaning, saturate work with clean water and flush off loose debris. Flush with water, <br /> from the top down.Areas below should also be saturated in order to prevent absorption of the run-off from above. <br /> 3. Starting at the top,apply cleaning solution.Allow cleaning solution to remain on the wall for approximately 5- 10 <br /> minutes, following the manufacturer's recommendations. Wooden paddles or other non-metallic tools may be <br /> used to remove stubborn particles. Do not use metal scrapers or chisels. Ideally, the cleaning crew shall be <br /> working on shaded areas to avoid rapid evaporation. <br /> 4. Rinse thoroughly. Flush the wall down with large amounts of clean water from top to bottom, before they can dry. <br /> Failure to completely flush the wall of cleaning solution and dissolved matter from top to bottom may result in the <br /> formation of"white scum". <br /> 5. Work in a small area.The size of the"wash down"area should be determined after a trial run. <br /> D. Safely discard solutions containing debris and residue. <br /> 3.10 PAINTING OF CMU BLOCK COLORED BANDS <br /> A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Architectural Painting <br /> Specification Manual". <br /> 1. Verify suitability of substrates, including surface conditions and compatibility,with existing finishes and primers. <br /> 2. Clean substrates of substances that could impair bond of paints,including dust,dirt,oil,grease,and incompatible <br /> pains and encapsulants. <br /> 3. Proceed with coating application only after unsatisfactory conditions have been corrected. <br /> 4. Apply paints to produce surface films without cloudiness,spotting,holidays,laps,brush marks,roller tracks,runs, <br /> sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks. <br /> 5. Dry film thickness of not less than 10 mils. <br /> 6. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or <br /> other methods. Do not scratch or damage adjacent finished surfaces. <br /> 3.11 APLICATION OF WATER REPELLANT <br /> A. For application of water repellant, see Section 07 19 00,Water Repellants. <br /> 3.12 PAINTING METAL LOUVERS <br /> A. Remove rust from surface of metal louvers. <br /> B. Apply paint according the paint manufacturer's recommendations. <br /> 3.13 PAINTING METAL LOUVERS <br /> A. Remove rust from surface of metal louvers. <br /> B. Apply paint according the paint manufacturer's recommendations. <br /> 3.14 APPLICATION OF PREFORMED SILICONE SEAL AT METAL COPING JOINTS <br /> A. Install preformed silicone seal as described in Section 07 92 00, Elastomeric Joint Sealants. <br /> 3.15 FINAL INSPECTION <br /> A. Upon completion of the Work an inspection shall be made by the Engineer to ascertain that the Work has been <br /> completed according to the contract documents and the manufacturers published requirements. Observed defects <br /> shall be corrected as required to secure the specified warranty(s). <br /> B. Work noted as deficient during the Final Inspection shall be repaired and corrected by the Contractor and made ready <br /> for reinspection within 5 working days. <br /> END OF SECTION 04 0120 <br /> ©BOOMERANG DESIGN 0401 20-6 510 Meadowlands Drive,Hillsborough,NC <br /> BD#1835 ORANGE COUNTY, NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.