Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 02 41 00—SELECTIVE DEMOLITION <br /> SECTION 01732 -SELECTIVE DEMOLITION <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes the following: <br /> 1. Demolition and removal of selected portions of a building. <br /> 2. Patching and repairs. <br /> B. Related Sections: The following Sections contain requirements that relate to this Section: <br /> 1. Division 01, Section "Summary"for use of the building and phasing requirements. <br /> 2. Division 01, Section "Information Available to Bidders"for remediation protocols related to the Work. <br /> 3. Division 01, Section "Cutting and Patching" for cutting and patching procedures for selective demolition <br /> operations. <br /> 4. Division 01, Section "Construction Progress Documentation"for selective demolition schedule requirements. <br /> 5. Division 01, Section "Closeout Procedures"for record document requirements. <br /> 1.2 DEFINITIONS <br /> A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the <br /> Owner's property. Refer to the Remediation Protocols provided in the Information Available to Bidders. <br /> B. Remove and Salvage: Items indicated to be removed and salvaged remain the Owner's property. Remove, clean, <br /> and pack or crate items to protect against damage. Identify contents of containers and deliver to Owner's designated <br /> storage area. Refer to the Remediation Protocols provided in the Information Available to Bidders. <br /> C. Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for reuse; store and <br /> protect against damage. Reinstall items in the same locations or in locations indicated. Refer to the Remediation <br /> Protocols provided in the Information Available to Bidders. <br /> D. Existing to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. <br /> When permitted by the Architect, items may be removed to a suitable, protected storage location during selective <br /> demolition and then cleaned and reinstalled in their original locations. Refer to the Remediation Protocols provided <br /> in the Information Available to Bidders. <br /> 1.3 MATERIALS OWNERSHIP <br /> A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the <br /> Owner's property, demolished materials shall become the Contractor's property and shall be removed from the site <br /> with further disposition at the Contractor's option. <br /> 1. Verify with Owner whether Owner wishes to retain any materials indicated to be removed. Turn over requested <br /> items to Owner. <br /> 1.4 SUBMITTALS <br /> A. Proposed remediation procedures and schedule. <br /> B. Proposed dust-control measures. <br /> C. Inventory of items to be removed and salvaged. <br /> D. Photographs, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might <br /> be misconstrued as damage caused by selective demolition operations. <br /> E. Record drawings at Project closeout according to Division 01, Section"Closeout Procedures." <br /> 1. Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical <br /> conditions. <br /> F. Landfill records indicating receipt and acceptance of hazardous wastes by a landfill facility licensed to accept <br /> hazardous wastes. <br /> 1.5 QUALITY ASSURANCE <br /> A. Demolition Firm Qualifications: Engage an experienced firm that has successfully completed selective demolition <br /> Work similar to that indicated for this Project. <br /> B. Regulatory Requirements: Comply with governing EPA notification regulations before starting selective demolition. <br /> Comply with hauling and disposal regulations of authorities having jurisdiction. <br /> ©BOOMERANG DESIGN 0241 00-1 510 Meadowlands Drive,Hillsborough,NC <br /> BD#1835 ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.