Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 73 00 29 E- ONSTUATION AN9 TUAINING <br /> / AUT 1 2GENEUAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for instructing Owner's personnel, including the <br /> following: <br /> 1. Demonstration of operation of systems, subsystems, and equipment. <br /> 2. Training in operation and maintenance of systems, subsystems, and equipment. <br /> B. Related Sections include the following: <br /> 1. Division 01, Section "Project Management and Coordination"for requirements for pre-instruction conferences. <br /> 1.2 SUBMITTALS <br /> A. Instruction Program: Submit two copies of outline of instructional program for demonstration and training in <br /> electronic format, including schedule of proposed dates, times, length of instruction time, and instructors' names <br /> for each training module. Include learning objective and outline for each training module. <br /> 1. At completion of training, submit two complete training manuals for Owner's use. <br /> B. Qualification Data: For firms and persons specified in "Quality Assurance"Article to demonstrate their capabilities <br /> and experience. Include lists of completed projects with project names and addresses, names and addresses of <br /> architects and owners, and other information specified. <br /> 1.3 QUALITY ASSURANCE <br /> A. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Division 01, <br /> Section "Quality Requirements,"experienced in operation and maintenance procedures and training. <br /> 1.4 COORDINATION <br /> A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to minimize disrupting <br /> Owner's operations. <br /> / AUT h 2/ U09 u CTS <br /> 2.1 INSTRUCTION PROGRAM <br /> A. Program Structure: Develop an instruction program that includes individual training modules for each system and <br /> equipment not part of a system, as required by individual Specification Sections, and as follows: <br /> 1. Flooring maintenance. <br /> 2. HVAC systems, including air distribution systems and terminal equipment and devices. <br /> 3. HVAC instrumentation and controls. <br /> B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of <br /> specific skills and knowledge that participant is expected to master. For each module, include instruction for the <br /> following: <br /> 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: <br /> a. System, subsystem, and equipment descriptions. <br /> b. Performance and design criteria if Contractor is delegated design responsibility. <br /> c. Operating standards. <br /> d. Regulatory requirements. <br /> e. Equipment function. <br /> f. Operating characteristics. <br /> g. Limiting conditions. <br /> h. Performance curves. <br /> 2. Documentation: Review the following items in detail: <br /> a. Emergency manuals. <br /> b. Operations manuals. <br /> c. Maintenance manuals. <br /> d. Project Record Documents. <br /> e. Identification systems. <br /> f. Warranties and bonds. <br /> g. Maintenance service agreements and similar continuing commitments. <br /> DPOO- EUANG 9 ESIGN HIQHNI 01 73 00 21 PAO- 1V85e z#d8o 9 AnRsr IaDi 5v6v, bsNC <br /> OUANGE COuNTgsNC 1h)071h01© <br />
The URL can be used to link to this page
Your browser does not support the video tag.