Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 78 39-PROJECT RECORD DOCUMENTS <br /> 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for <br /> different categories of the Work at the same location. <br /> 5. Mark important additional information that was either shown schematically or omitted from original Drawings. <br /> 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar <br /> identification,where applicable. <br /> 2.2 RECORD SPECIFICATIONS <br /> A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that <br /> indicated in Specifications, addenda, and contract modifications. <br /> 1. Give particular attention to information on concealed products and installations that cannot be readily <br /> identified and recorded later. <br /> 2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, <br /> including substitutions and product options selected. <br /> 3. Record the name of the manufacturer, supplier, Installer, and other information necessary to provide a record <br /> of selections made. <br /> 4. For each principal product, indicate whether Record Product Data has been submitted in operation and <br /> maintenance manuals instead of submitted as Record Product Data. <br /> 5. Note related Change Orders, Record Drawings, and Product Data where applicable. <br /> 2.3 MISCELLANEOUS RECORD SUBMITTALS <br /> A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and <br /> submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, <br /> ready for continued use and reference. <br /> PART 3-EXECUTION <br /> 3.1 RECORDING AND MAINTENANCE <br /> A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document <br /> purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of <br /> Project. <br /> B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart <br /> from the Contract Documents used for construction. Do not use Project Record Documents for construction <br /> purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from <br /> deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal <br /> working hours. <br /> END OF SECTION 01 78 39 <br /> ©BOOMERANG DESIGN#1835 01 78 39-2 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.