Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 70 00 -EXECUTION REQUIREMENTS <br /> 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as <br /> appropriate. <br /> D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of <br /> manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific <br /> cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and <br /> that will not damage exposed surfaces. <br /> E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. <br /> F. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and <br /> deterioration at time of Substantial Completion. <br /> G. Cutting and Patching: Clean areas and spaces where cutting and patching are performed. Completely remove <br /> paint, mortar, oils, putty, and similar materials. <br /> 1. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. <br /> Restore damaged pipe covering to its original condition. <br /> H. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down <br /> sewers or into waterways will not be permitted. <br /> I. During handling and installation, clean and protect construction in progress and adjoining materials already in <br /> place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial <br /> Completion. <br /> J. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of <br /> the construction period.Adjust and lubricate operable components to ensure operability without damaging effects. <br /> K. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in <br /> progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction <br /> period. <br /> 3.6 STARTING AND ADJUSTING <br /> A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with <br /> new units, and retest. <br /> B. Adjust operating components for proper operation without binding.Adjust equipment for proper operation. <br /> C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged <br /> and malfunctioning controls and equipment. <br /> D. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled <br /> components and equipment installation, comply with qualification requirements in Division 01, Section "Quality <br /> Requirements." <br /> 3.7 PROTECTION OF INSTALLED CONSTRUCTION <br /> A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at <br /> time of Substantial Completion. <br /> B. Comply with manufacturer's written instructions for temperature and relative humidity. <br /> 3.8 CORRECTION OF THE WORK <br /> A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with <br /> requirements in Division 01, Section "Cutting and Patching." <br /> 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching <br /> materials, and properly adjusting operating equipment. <br /> B. Restore permanent facilities used during construction to their specified condition. <br /> C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible <br /> evidence of repair. <br /> D. Repair components that do not operate properly.Remove and replace operating components that cannot be repaired. <br /> E. Remove and replace chipped, scratched, and broken glass or reflective surfaces. <br /> END OF SECTION 01 70 00 <br /> ©BOOMERANG DESIGN#1835 01 70 00-3 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.