Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 70 00 -EXECUTION REQUIREMENTS <br /> 3.2 PREPARATION <br /> A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements <br /> before installing each product. Where portions of the Work are indicated to fit to other construction, verify <br /> dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with <br /> construction progress to avoid delaying the Work. <br /> B. Space Requirements:Verify space requirements and dimensions of items shown diagrammatically on Drawings. <br /> C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the <br /> Contract Documents, submit a request for information to Architect. Include a detailed description of problem <br /> encountered, together with recommendations for changing the Contract Documents. Submit requests on <br /> Document 00 63 13"Request for Interpretation." <br /> 3.3 CONSTRUCTION LAYOUT <br /> A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the <br /> property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly. <br /> B. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include <br /> beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party <br /> member, and types of instruments and tapes used. Make the log available for reference by Architect. <br /> 3.4 INSTALLATION <br /> A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as <br /> indicated. <br /> 1. Make vertical work plumb and make horizontal work level. <br /> 2. Where space is limited, install components to maximize space available for maintenance and ease of removal <br /> for replacement. <br /> 3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated. <br /> 4. Maintain minimum headroom clearance of 8 feet(2.4 m)in spaces without a suspended ceiling. <br /> B. Comply with manufacturer's written instructions and recommendations for installing products in applications <br /> indicated. <br /> C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions <br /> required for product performance until Substantial Completion. <br /> D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess <br /> of that expected during normal conditions of occupancy. <br /> E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. <br /> F. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, <br /> accurately located and aligned with other portions of the Work. <br /> 1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by <br /> Architect. <br /> 2. Allow for building movement, including thermal expansion and contraction. <br /> G. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the <br /> best visual effect. Fit exposed connections together to form hairline joints. <br /> H. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous. <br /> 3.5 PROGRESS CLEANING <br /> A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint- <br /> use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully. <br /> 1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. <br /> 2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise <br /> above 80 deg F. <br /> 3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers <br /> appropriately and dispose of legally, according to regulations. <br /> B. Site: Maintain Project site free of waste materials and debris. <br /> C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of <br /> the Work. <br /> 1. Remove liquid spills promptly. <br /> ©BOOMERANG DESIGN#1835 01 70 00-2 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.