Orange County NC Website
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> S. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding <br /> coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, <br /> and term of the coverage. <br /> T. Construction Photographs and Videotapes: Comply with requirements in Division 01, Section "Construction <br /> Progress Documentation." <br /> U. Material Safety Data Sheets: Submit information directly to Owner. If submitted to Architect, Architect will not <br /> review this information but will return it with no action taken. <br /> PART 3-EXECUTION <br /> 3.1 CONTRACTOR'S REVIEW <br /> A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field <br /> dimensions. Mark with approval stamp before submitting to Architect. <br /> B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, <br /> submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and <br /> statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract <br /> Documents. <br /> 3.2 ARCHITECT'S ACTION <br /> A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them <br /> without action. <br /> B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications <br /> required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately <br /> to indicate action taken, as follows: <br /> 1. Architect Action: <br /> a. No Exceptions Taken: Contractor may proceed with the Work. <br /> b. Exceptions Indicated: Contractor may proceed with the Work provided the indicated Exceptions are <br /> corrected. <br /> c. Revise and Resubmit: Work may not proceed until the Contractor revises the submittal to reflect the <br /> requirements of the Contract Documents and Architect approves the revised submittal. <br /> C. Informational Submittals: Architect will review each submittal and will not return it, or will reject and return it if it <br /> does not comply with requirements. Architect will forward each submittal to appropriate party. <br /> D. Submittals not required by the Contract Documents will not be reviewed and may be discarded. <br /> END OF SECTION 01 33 00 <br /> ©BOOMERANG DESIGN#1835 01 33 00-6 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />