Orange County NC Website
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> H. Material Certificates: Prepare written statements on manufacturer's original letterhead certifying that material <br /> complies with requirements. <br /> I. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, <br /> indicating and interpreting test results of material for compliance with requirements. <br /> J. Pre-Construction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard <br /> form, indicating and interpreting results of tests performed before installation of product, for compliance with <br /> performance requirements. <br /> K. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard <br /> form, indicating and interpreting results of compatibility tests performed before installation of product. Include <br /> written recommendations for primers and substrate preparation needed for adhesion. <br /> L. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, <br /> indicating and interpreting results of field tests performed either during installation of product or after product is <br /> installed in its final location,for compliance with requirements. <br /> M. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with <br /> requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing <br /> agency, or on comprehensive tests performed by a qualified testing agency. <br /> N. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities <br /> having jurisdiction,that product complies with building code in effect for Project. Include the following information: <br /> 1. Name of evaluation organization. <br /> a. International Building Code (IBC). <br /> b. When reports are not available from above organization, Architect may consider reports of Building <br /> Official and Code Administrators International, Inc. (BOCA)or similar organization, subject to the approval <br /> of officials having jurisdiction. <br /> 2. Date of evaluation. <br /> 3. Time period when report is in effect. <br /> 4. Product and manufacturers' names. <br /> 5. Description of product. <br /> 6. Test procedures and results. <br /> 7. Limitations of use. <br /> O. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance <br /> of products and equipment. Comply with requirements in Division 01, Section"Operation and Maintenance Data." <br /> P. Design Data: Prepare written and graphic information, including, but not limited to, performance and design <br /> criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other <br /> performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and <br /> version of software, if any, used for calculations. Include page numbers. <br /> Q. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's <br /> recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of <br /> product and name, address, and telephone number of manufacturer. Include the following, as applicable: <br /> 1. Preparation of substrates. <br /> 2. Required substrate tolerances. <br /> 3. Sequence of installation or erection. <br /> 4. Required installation tolerances. <br /> 5. Required adjustments. <br /> 6. Recommendations for cleaning and protection. <br /> R. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's <br /> tests and inspections. Include the following, as applicable: <br /> 1. Name, address, and telephone number of factory-authorized service representative making report. <br /> 2. Statement on condition of substrates and their acceptability for installation of product. <br /> 3. Statement that products at Project site comply with requirements. <br /> 4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what <br /> corrective action was taken. <br /> 5. Results of operational and other tests and a statement of whether observed performance complies with <br /> requirements. <br /> 6. Statement whether conditions, products, and installation will affect warranty. <br /> 7. Other required items indicated in individual Specification Sections. <br /> ©BOOMERANG DESIGN#1835 01 33 00-5 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />