Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, <br /> Samples, and other miscellaneous submittals. <br /> B. Submittals(excluding material samples)will only be accepted ELECTRONICALLY. <br /> C. Related Sections include the following: <br /> 1. Division 01, Section "Payment Procedures"for submitting Applications for Payment. <br /> 2. Division 01, Section "Project Management and Coordination"for submitting Coordination Drawings. <br /> 3. Division 01, Section "Construction Progress Documentation" for submitting schedules and reports, including <br /> Contractor's Construction Schedule and the Submittals Schedule and construction photographs. <br /> 4. Division 01, Section "Quality Requirements" for submitting test and inspection reports and Delegated-Design <br /> Submittals and for erecting mockups. <br /> 5. Division 01, Section "Project Record Documents"for submitting Record Drawings, Record Specifications, and <br /> Record Product Data. <br /> 6. Division 01, Section "Operation and Maintenance Data"for operation and maintenance manual requirements. <br /> 1.2 DEFINITIONS <br /> A. Action Submittals: Written and graphic information that requires Architect's responsive action. <br /> B. Informational Submittals: Written information that does not require Architect's responsive action. Submittals may <br /> be rejected for not complying with requirements. <br /> 1.3 SUBMITTAL PROCEDURES <br /> A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. <br /> 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related <br /> activities that require sequential activity. <br /> 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be <br /> delayed because of need to review submittals concurrently for coordination. <br /> a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals <br /> until related submittals are received. <br /> 3. Color Selections: Because the Architect must prepare comprehensive color selections for Owner approval, <br /> the Contractor must submit all color samples, charts, etc., at the same time and in one package. Color <br /> selections cannot be made independently of one another. Once the Contractor submits the color package, <br /> the Architect will prepare comprehensive color selections for Owner approval. Upon approval by Owner, the <br /> Architect will issue a color schedule. <br /> B. Submittals Schedule: Comply with requirements in Division 01, Section "Construction Progress Documentation"for <br /> list of submittals and time requirements for scheduled performance of related construction activities. <br /> C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for <br /> review shall commence on Architect's receipt of submittal. <br /> 1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if processing must be <br /> delayed to permit coordination with subsequent submittals. Architect will advise Contractor when a submittal <br /> being processed must be delayed for coordination. <br /> 2. Direct Transmittal to Consultant: Where the Contract Documents indicate that submittals may be transmitted <br /> directly to Architect's consultants, provide duplicate copy to Architect. Submittal will be returned to Architect, <br /> before being returned to Contractor. Submit the following directly to consultants: <br /> a. Concrete Work. <br /> b. Structural Steel, including Steel Joists and Deck. <br /> c. Mechanical Work. <br /> d. Plumbing Work. <br /> e. Electrical Work. <br /> 3. If intermediate submittal is necessary, process it in same manner as initial submittal. <br /> 4. Allow 5 days for processing each resubmittal. <br /> 5. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in <br /> advance of the Work to permit processing. <br /> D. Identification: Place a permanent label or title block on each submittal for identification. <br /> ©BOOMERANG DESIGN#1835 01 33 00-1 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.