Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 32 00-CONSTRUCTION PROGRESS DOCUMENTATION <br /> 10. Emergency procedures. <br /> 11. Orders and requests of authorities having jurisdiction. <br /> 12. Change Orders received and implemented. <br /> 13. Construction Change Directives received. <br /> 14. Services connected and disconnected. <br /> 15. Equipment or system tests and startups. <br /> 16. Partial Completions and occupancies. <br /> 17. Substantial Completions authorized. <br /> B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract <br /> Documents, prepare a detailed report. Submit in electronic format with a Request for Interpretation. Include a <br /> detailed description of the differing conditions, together with recommendations for changing the Contract <br /> Documents. <br /> 2.5 SPECIAL REPORTS <br /> A. General: Submit special reports in electronic format directly to Owner within one day of an occurrence. Distribute <br /> copies of report to parties affected by the occurrence. <br /> PART 3 -EXECUTION <br /> 3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE <br /> A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction <br /> progress and activities. Issue schedule one week before each regularly scheduled progress meeting. <br /> 1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or <br /> made. Issue updated schedule concurrently with the report of each such meeting. <br /> 2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in <br /> logic, durations, actual starts and finishes, and activity durations. <br /> 3. As the Work progresses, indicate Actual Completion percentage for each activity. <br /> B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and <br /> inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility. <br /> 1. Post copies in Project meeting rooms and temporary field offices. <br /> 2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. <br /> Delete parties from distribution when they have completed their assigned portion of the Work and are no <br /> longer involved in performance of construction activities. <br /> END OF SECTION 01 32 00 <br /> ©BOOMERANG DESIGN#1835 01 32 00-4 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.