2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 32 00-CONSTRUCTION PROGRESS DOCUMENTATION <br /> c. Uninterruptible services. <br /> d. Partial occupancy before Substantial Completion. <br /> e. Use of premises restrictions. <br /> f. Provisions for future construction. <br /> g. Seasonal variations, including anticipated adverse weather days. <br /> h. Environmental control. <br /> 5. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not <br /> limited to,the following: <br /> a. Subcontract awards. <br /> b. Submittals. <br /> c. Purchases. <br /> d. Mockups. <br /> e. Fabrication. <br /> f. Sample testing. <br /> g. Deliveries. <br /> h. Installation. <br /> i. Tests and inspections. <br /> j. Adjusting. <br /> k. Curing. <br /> I. Startup and placement into final use and operation. <br /> E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to: <br /> 1. Notice to Proceed. <br /> 2. Exterior demolition complete. <br /> 3. Exterior remediation complete. <br /> 4. Interior demolition complete. <br /> 5. Insulation and sealant complete. <br /> 6. Building dried in and secure. <br /> 7. Above ceiling inspection (if required). <br /> 8. Interior finishes complete. <br /> 9. Substantial Completion. <br /> 10. Final Completion. <br /> 2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART) <br /> A. Gantt-Chart Schedule: Submit in electronic format a comprehensive, fully developed, horizontal Gantt-chart-type, <br /> Contractor's Construction Schedule within 30 days of date established for the Notice to Proceed. Base schedule <br /> on the Preliminary Construction Schedule and whatever updating and feedback was received since the start of <br /> Project. <br /> B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a <br /> continuous vertical line. <br /> 1. For construction activities that require 2 months or longer to complete, indicate an estimated completion <br /> percentage in 10 percent increments within time bar. <br /> 2.4 REPORTS <br /> A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning <br /> events at Project site: <br /> 1. List of subcontractors at Project site. <br /> 2. List of separate contractors at Project site. <br /> 3. Approximate count of personnel at Project site. <br /> 4. High and low temperatures and general weather conditions. <br /> 5. Accidents. <br /> 6. Meetings and significant decisions. <br /> 7. Unusual events(refer to special reports). <br /> 8. Stoppages, delays, shortages, and losses. <br /> 9. Meter readings and similar recordings. <br /> ©BOOMERANG DESIGN#1835 01 32 00-3 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.