DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 32 00-CONSTRUCTION PROGRESS DOCUMENTATION <br /> c. Uninterruptible services. <br /> d. Partial occupancy before Substantial Completion. <br /> e. Use of premises restrictions. <br /> f. Provisions for future construction. <br /> g. Seasonal variations, including anticipated adverse weather days. <br /> h. Environmental control. <br /> 5. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not <br /> limited to,the following: <br /> a. Subcontract awards. <br /> b. Submittals. <br /> c. Purchases. <br /> d. Mockups. <br /> e. Fabrication. <br /> f. Sample testing. <br /> g. Deliveries. <br /> h. Installation. <br /> i. Tests and inspections. <br /> j. Adjusting. <br /> k. Curing. <br /> I. Startup and placement into final use and operation. <br /> E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to: <br /> 1. Notice to Proceed. <br /> 2. Exterior demolition complete. <br /> 3. Exterior remediation complete. <br /> 4. Interior demolition complete. <br /> 5. Insulation and sealant complete. <br /> 6. Building dried in and secure. <br /> 7. Above ceiling inspection (if required). <br /> 8. Interior finishes complete. <br /> 9. Substantial Completion. <br /> 10. Final Completion. <br /> 2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART) <br /> A. Gantt-Chart Schedule: Submit in electronic format a comprehensive, fully developed, horizontal Gantt-chart-type, <br /> Contractor's Construction Schedule within 30 days of date established for the Notice to Proceed. Base schedule <br /> on the Preliminary Construction Schedule and whatever updating and feedback was received since the start of <br /> Project. <br /> B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a <br /> continuous vertical line. <br /> 1. For construction activities that require 2 months or longer to complete, indicate an estimated completion <br /> percentage in 10 percent increments within time bar. <br /> 2.4 REPORTS <br /> A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning <br /> events at Project site: <br /> 1. List of subcontractors at Project site. <br /> 2. List of separate contractors at Project site. <br /> 3. Approximate count of personnel at Project site. <br /> 4. High and low temperatures and general weather conditions. <br /> 5. Accidents. <br /> 6. Meetings and significant decisions. <br /> 7. Unusual events(refer to special reports). <br /> 8. Stoppages, delays, shortages, and losses. <br /> 9. Meter readings and similar recordings. <br /> ©BOOMERANG DESIGN#1835 01 32 00-3 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />