2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 32 00-CONSTRUCTION PROGRESS DOCUMENTATION <br /> 9. Review procedures for updating schedule. <br /> 1.4 COORDINATION <br /> A. Coordinate preparation and processing of schedules and reports with performance of construction activities.. <br /> B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, list of products <br /> and suppliers, Submittals Schedule, progress reports, payment requests, and other required schedules and <br /> reports. <br /> 1. Secure time commitments for performing critical elements of the Work from parties involved. <br /> 2. Coordinate each construction activity in the network with other activities and schedule them in proper <br /> sequence. <br /> PART 2 -PRODUCTS <br /> 2.1 SUBMITTALS SCHEDULE <br /> A. Preparation: Submit a schedule in electronic format of submittals, arranged in chronological order by dates <br /> required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, <br /> fabrication, and delivery when establishing dates. <br /> 1. Coordinate Submittals Schedule with list of subcontracts, the list of products and suppliers, the Schedule of <br /> Values, and Contractor's Construction Schedule. <br /> 2. Initial Submittal: Submit concurrently with preliminary schedule submittal. Include submittals required during <br /> the first 30 days of inactive construction. List those required to maintain orderly progress of the Work and <br /> those required early because of long lead time for manufacture or fabrication. <br /> 3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's Construction Schedule. <br /> 2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL <br /> A. Procedures: Comply with procedures contained in AGC's"Construction Planning&Scheduling." <br /> B. Time Frame: Extend schedule from date established for the Notice to Proceed to dates of Substantial Completion <br /> and Final Completion. <br /> 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion <br /> date, unless specifically authorized by Change Order. <br /> C. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the <br /> Work. Comply with the following: <br /> 1. Activity Duration: Define activities so no activity is longer than 10 days, unless specifically allowed by <br /> Architect. <br /> 2. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a <br /> cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are <br /> not limited to, submittals, approvals, purchasing,fabrication, and delivery. <br /> a. Storefront Windows. <br /> b. HVAC. <br /> 3. Submittal Review Time: Include review and resubmittal times indicated in Division 01, Section "Submittal <br /> Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with <br /> Submittals Schedule. <br /> 4. Insert appropriate number of days for startup and testing. <br /> 5. Startup and Testing Time: Include not less than 15 days for startup and testing. <br /> 6. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and <br /> allow time for Architect's administrative procedures necessary for certification of Substantial Completion. <br /> D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in <br /> schedule, and show how the sequence of the Work is affected. <br /> 1. Phasing:Arrange list of activities on schedule by phase. <br /> 2. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in <br /> Division 01, Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date. <br /> 3. Owner-Furnished Products: Include a separate activity for each product. Include delivery date indicated in <br /> Division 01, Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date. <br /> 4. Work Restrictions: Show the effect of the following items on the schedule: <br /> a. Coordination with existing construction. <br /> b. Limitations of continued occupancies. <br /> ©BOOMERANG DESIGN#1835 01 32 00-2 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.