2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 31 00 -PROJECT MANAGEMENT AND COORDINATION <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative provisions for coordinating construction operations on Project including, but <br /> not limited to, the following: <br /> 1. General project coordination procedures. <br /> 2. Conservation. <br /> 3. Coordination Drawings. <br /> 4. Administrative and supervisory personnel. <br /> 5. Project meetings. <br /> B. Each contractor shall participate in coordination requirements. Certain areas of responsibility will be assigned to a <br /> specific contractor. <br /> C. Related Sections: The following Sections contain requirements that relate to this Section: <br /> 1. Division 01, Section "Construction Progress Documentation" for preparing and submitting the Contractor's <br /> Construction Schedule. <br /> 2. Division 01, Section "Execution Requirements" for procedures for coordinating general installation and field- <br /> engineering services, including establishment of benchmarks and control points. <br /> 3. Division 01, Section "Closeout Procedures"for coordinating Contract closeout. <br /> 1.2 COORDINATION <br /> A. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and <br /> entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its <br /> operations with operations, included in different Sections, that depend on each other for proper installation, <br /> connection, and operation. <br /> 1. Cooperate with overall project scheduling activities of Project Coordinator. <br /> 2. Schedule construction operations in sequence required to obtain the best results where installation of one part <br /> of the Work depends on installation of other components, before or after its own installation. <br /> 3. Coordinate installation of different components with other contractors to ensure maximum accessibility for <br /> required maintenance, service, and repair. <br /> 4. Make adequate provisions to accommodate items scheduled for later installation. <br /> B. Administrative Procedures: The Contractors shall coordinate project schedule and timing of required administrative <br /> procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure <br /> orderly progress of the Work. Such administrative activities include, but are not limited to,the following: <br /> 1. Preparation of Contractor's Construction Schedule. <br /> 2. Preparation of the Schedule of Values. <br /> 3. Installation and removal of temporary facilities and controls. <br /> 4. Delivery and processing of submittals. <br /> 5. Progress meetings. <br /> 6. Preinstallation conferences. <br /> 7. Project closeout activities. <br /> C. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given <br /> to conservation of energy,water, and materials. <br /> 1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. <br /> 2. Make maximum use of available, cost-effective means of recycling construction waste as an alternative to the <br /> use of local landfills. Recyclable waste materials may include: <br /> a. Concrete and masonry. <br /> b. Metals including debris from construction personnel. <br /> c. Wood materials including pallets. <br /> d. Corrugated cardboard cartons. <br /> e. Glass materials including debris from construction personnel. <br /> 1.3 SUBMITTALS <br /> A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum <br /> utilization of space for efficient installation of different components or if coordination is required for installation of <br /> products and materials fabricated by separate entities. <br /> ©BOOMERANG DESIGN#1835 01 31 00-1 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.