Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> REVISED 4108102 SECTION 01 -- 00 UMNIT RYICES <br /> RAYT 1 UDENEYAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for unit prices. <br /> B. Related Sections include the following: <br /> 1. Division 01, Section "Allowances"for procedures for using unit prices to adjust quantity allowances. <br /> 2. Division 01, Section "Contract Modification Procedures" for procedures for submitting and handling Change <br /> Orders. <br /> 1.2 DEFINITIONS <br /> A. Unit price is an amount proposed by bidders, stated on the Bid Supplement Form, as a price per unit of <br /> measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if <br /> estimated quantities of Work required by the Contract Documents are increased or decreased. <br /> 1.3 PROCEDURES <br /> A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, <br /> and profit. <br /> B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit <br /> prices. Methods of measurement and payment for unit prices are specified in those Sections. <br /> C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit <br /> prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. <br /> D. List of Unit Prices: A list of unit prices is included at the end of this Section. Specification Sections referenced in the <br /> schedule contain requirements for materials described under each unit price. <br /> RAYT- URYO#MCTS(Nwt Mr ao) <br /> RAYT 5 UEXECMTION <br /> 3.1 LIST OF UNIT PRICES <br /> A. UP-1: Remove and replace existing sealant and backing material at CMU masonry wall control/expansion joints. <br /> Refer to Section 07 92 00. <br /> 1. Unit of Measurement: Linear Foot(LF) <br /> B. UP-2: Remove sealant applied to cracks in CMU and cracks in CMU masonry joints. Refer to Section 04 00 20. <br /> 1. Unit of Measurement: Linear Foot(LF) <br /> C. UP-3: Cut-out/rout cracks in CMU and install backer material and sealant. Refer to Section 04 01 20. <br /> 1. Unit of Measurement: Linear Foot(LF) <br /> D. UP-4: Cut-out/rout existing mortar and repoint CMU masonry joints. Refer to Section 04 01 20. <br /> 1. Unit of Measurement: Linear Foot(LF) <br /> E. UP-5: Remove and replace Split-faced CMU block. Refer to Section 04 01 20. <br /> 1. Unit of Measurement: Per Unit(PU) <br /> F. UP-6: Cleaning of exterior CMU masonry surfaces. Refer to Section 04 01 20. <br /> 1. Unit of Measurement: Square Foot(SF) <br /> G. UP-7:Application of water repellant to exterior CMU masonry surfaces. Refer to Section 07 19 00. <br /> 1. Unit of Measurement: Square Foot(SF) <br /> H. UP-8: Surface preparation and application of primer and coating to sheet metal surface. Refer to Section 09 90 00. <br /> 1. Unit of Measurement: Square Foot(SF) <br /> I. UP-9: Surface preparation and application of 2-inch width pre-manufactured silicone strip at metal joints. Refer to <br /> Section 07 92 00. <br /> 1. Unit of Measurement: Linear Foot(LF) <br /> J. UP-10: Surface preparation and application of 1" wide bond breaker tape centered over joints and application of <br /> high-performance high-build polyether-fluid-applied flashing membrane 3" wide centered over the tape and gutter <br /> joints. Refer to Section 07 92 00. <br /> ©BOOGEYAND#ESIDN 8135e 01 -- 00 U1 e10 GadoW rdsor #iq aFbvrruWvwgh2FNC <br /> OYANDE COMNT/ HNC 1-iOnO13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.