Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 00 00 -SUMMARY <br /> f. General requirements and specific recommendations of the material manufacturers are included as part <br /> of these specifications. The manufacturers' specifications are the minimum standards required for the <br /> completed systems. Specific items listed herein may improve the standards required by the <br /> manufacturers and will take precedence where their compliance will not affect the manufacturers' <br /> guarantee or warranty provisions. <br /> g. The building is defined under the North Carolina State 2006 NC State Building Code as Type II-B. <br /> Occupancy is Business and Storage (S-1). <br /> 1.2 CONTRACTS <br /> A. Project will be constructed under a general construction contract. <br /> 1.3 SITE INVESTIGATION <br /> A. The Contractor acknowledges that he has satisfied himself as to the nature and location of the Work, the <br /> general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of <br /> materials, availability of labor, water, electric power, roads and uncertainties of weather, ground water table or <br /> similar physical conditions at the site, the conformation and condition of the ground, the character, quality and <br /> quantity of surface and subsurface materials to be encountered, the character of equipment and facilities <br /> needed prior to and during the prosecution of the Work and all other matters which can in any way affect the <br /> Work or the cost thereof under this Contract. Any failure by the Contractor to acquaint himself with all the <br /> available information concerning these conditions will not relieve him from responsibility for estimating properly <br /> the difficulty or cost of successfully performing the Work. Field measurements shall be taken at the site by the <br /> Contractor to verify all data and conditions affected by the Work. <br /> 1.4 USE OF PREMISES <br /> A. General: Contractor shall have full use of premises for construction operations, including use of Project site, <br /> during construction period. Contractor's use of premises is limited only by Owner's right to perform work or to <br /> retain other contractors on portions of Project. <br /> 1.5 SPECIFICATION FORMATS AND CONVENTIONS <br /> A. Specification Format:The Specifications are organized into Divisions and Sections using the 50-Division format <br /> of CSI/CSC's"MasterFormat"2004 Edition numbering system. <br /> B. Specification Content: The Specifications use certain conventions for the style of language and the intended <br /> meaning of certain terms, words, and phrases when used in particular situations. These conventions are as <br /> follows: <br /> 1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. <br /> Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred <br /> as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted <br /> as singular where applicable as the context of the Contract Documents indicates. <br /> 2. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed <br /> in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive <br /> mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly <br /> by Contractor or by others when so noted. <br /> a. The words "shall," "shall be," or"shall comply with," depending on the context, are implied where a <br /> colon (:)is used within a sentence or phrase. <br /> PART 2-PRODUCTS(Not Used) <br /> PART 3-EXECUTION (Not Used) <br /> END OF SECTION 01 00 00 <br /> ©BOOMERANG DESIGN#1835 01 00 00-3 510 Meadowlands Drive,Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.