Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 42 <br /> ARTICLE 25. CONTRACTOR AND SUBCONTRACTOR RELATIONSHIPS <br /> 25.1 Within thirty (30) days after initial receipt of the Construction Contract for signatures the <br /> Contractor shall submit to the Designer and Owner for acceptance a current list of the names of <br /> Subcontractors and such other persons and organizations (including those who are to furnish <br /> materials or equipment fabricated to a special design) proposed for any and all portions of the <br /> Work. The Contractor shall provide this list at this time even if the Contractor was required to <br /> submit a list of proposed Subcontractors with the Contractor's bid. The Designer shall promptly <br /> reply to the Contractor in writing stating whether or not the Owner or the Designer, after due <br /> investigation, has objection to any such proposed person or entity or if it needs additional <br /> information to evaluate the persons on the list. Failure of the Designer to reply within ten (10) <br /> days after the Contractor has furnished all required information shall constitute notice of no <br /> objection. <br /> The Contractor shall not contract with any such proposed person or entity to whom the Owner <br /> or the Designer has made reasonable objection. If the Designer or Owner has reasonable <br /> objection to any such proposed person or entity, the Contractor shall submit a substitute to <br /> whom the Owner and the Designer have no reasonable objection. The Contractor shall make no <br /> substitution for any Subcontractor, person, or entity previously allowed without first notifying the <br /> Designer and Owner in writing and no substitution may be made if the Owner or Designer <br /> makes a reasonable objection to such substitution. <br /> 25.2 The Contractor agrees that the terms of the Contract Documents, including all portions <br /> thereof, shall apply to all Subcontractors of the Contractor as if they were the Contractor, and <br /> that the Subcontractors of the Contractor shall, by means of their subcontracts, be bound by all <br /> the terms of the Contract Documents including, but not limited to, Article 26 of these General <br /> Conditions. <br /> 25.3 Payments to Subcontractors shall be made in accordance with the provisions of N.C. Gen. <br /> Stat. §143-134.1. <br /> ARTICLE 26. USE OF PREMISES <br /> 26.1 The Contractor shall confine apparatus, the storage of materials, the operations of workers, <br /> and the disposal of material to limits indicated by law, ordinances, permits, and directions of the <br /> Designer, if any. <br /> 26.2 The Contractor shall not load or permit any part of the Work to be loaded with a weight that <br /> will endanger its safety, intended performance, or configuration. <br /> 26.3 The Contractor shall enforce all of the Designer's instructions, including, but not limited to, <br /> those regarding signs, advertisements, fires, and smoking. <br /> ARTICLE 27. CUTTING, PATCHING AND FITTING <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.