Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 40 <br /> ARTICLE 21. FINAL PAYMENT <br /> 21.1 If the Work of the Contractor is limited to demolition, pilings, caissons and/or structural <br /> steel, the remaining unpaid balance of the Contractor's Contract Price, less a sum equal to five- <br /> tenths percent (0.5%) of the Contract Price, shall be paid within sixty days following receipt of <br /> the following documents, all of which must be received before payment shall become due: (i) <br /> request for payment from the Contractor; (ii) receipt of consent from the Contractor's surety to <br /> the payment; and (iii) approval or certification from the Designer that the work performed by the <br /> Contractor is acceptable and in accordance with the Contract Documents. <br /> 21.2 Except as set forth in paragraph 21.1, within forty five days after Substantial Completion of <br /> the Project, the remaining unpaid balance of the Contract Price shall be paid to the Contractor, <br /> less an amount equal to two and one-half times the value of punch list work or other work <br /> remaining to be completed or corrected, as reasonably estimated by the Owner. <br /> 21.3 Upon Substantial Completion, the Designer shall prepare and submit to the Contractor a <br /> deficiency list identifying all portions of the Work which are known by the Designer at that time <br /> to be incomplete or defective. Within thirty (30) days of receipt of this deficiency list, the <br /> Contractor shall complete and correct all items on that list along with all other Work required to <br /> achieve Final Completion of the Work. At any time prior to completion of the period of warranty, <br /> the Designer may submit to the Contractor a supplemental deficiency list, in which case the <br /> Contractor shall complete or correct any and all new items identified on the supplemental <br /> deficiency list within the time period stipulated in paragraph 18.3. <br /> 21.4 Final Payment of any remaining balance of the Contract Price shall not be due to the <br /> Contractor until the Contractor achieves Final Completion of the Project. <br /> 21.5 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br /> Owner except: <br /> a) Claims arising from unsettled liens or claims against the Contractor. <br /> b) Defective Work or materials appearing after Final Payment. <br /> c) Failure of the Contractor to perform the Work in accordance with the Contract Documents. <br /> d) As conditioned in the Performance Bond. <br /> e) Claims made prior to Final Payment which remain unsettled. <br /> f) Amounts due arising under Articles 18 and 28. <br /> g) Claims for recovery of overpayment based upon incorrect measurement, estimate, or <br /> certificate. <br /> 21.6 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br /> Contractor except those claims previously made in writing pursuant to paragraph 15.2 and <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.