Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 37 <br /> If the Contractor, after notice, fails to proceed promptly to comply with the terms of the <br /> guarantee, the Owner may have the defects corrected, and the Contractor and the Contractor's <br /> ureties shall be liable for all expenses incurred. "Promptly" is defined as within twenty-four (24) <br /> hours for systems necessary to normal operation of the building and within seventy-two (72) <br /> hours for all other items. All special guarantees applicable to definite parts of the Work that may <br /> be shown in or required by Contract Documents shall be subject to the terms of this paragraph <br /> during the first year of the life of such special guarantee. Manufacturer's standard guarantees or <br /> warranties which do not comply with the time limit specified herein shall be extended by the <br /> Contractor automatically without further action on the part of the Owner or the Designer. <br /> 18.4 In the eleventh calendar month after the date of Substantial Completion, and at the request <br /> of the Owner, the Contractor, the Owner and the Designer shall make an inspection of the Work <br /> for the purpose of identifying defective workmanship and/or materials. If the Contractor, having <br /> been requested to do so by the Owner, fails to participate in such inspection, the Contractor <br /> shall be conclusively bound by any decision or ruling by the Designer as to any defective <br /> workmanship or material and as to the Contractor's responsibility for its repair or replacement. <br /> ARTICLE 19. OWNER'S RIGHT TO DO WORK <br /> 19.1 If, during the progress of the Work or during any period of guarantee, the Contractor fails to <br /> prosecute the Work properly or to perform any provision of the Contract Documents, the Owner, <br /> after three (3) days written notice to the Contractor from the Designer, or from the Owner after <br /> Final Payment, may perform or have performed that portion of the Work and may deduct the <br /> cost thereof from any amounts due or to become due the Contractor. Notwithstanding any <br /> action by the Owner under this paragraph, all warranties and bonds given or to be given by the <br /> Contractor shall remain in effect or shall be given by the Contractor. <br /> 19.2 Should the cost of such action by the Owner exceed the amount due or to become due the <br /> Contractor, the Contractor and his sureties shall be liable for and shall pay to the Owner the <br /> amount of such excess. <br /> ARTICLE 20. PARTIAL PAYMENTS <br /> 20.1 Within thirty (30) days after his initial receipt of the Construction Contract for signatures, <br /> the Contractor shall submit to the Designer a Schedule of Values. The Schedule of Values shall <br /> indicate the value of the Work, including applicable overhead and profit, for each Division and <br /> section of the Project Specifications. The Designer and Owner shall be provided with the <br /> Contractor's estimate papers, Subcontractor agreements, supplier quotes, or other documents <br /> substantiating these values if so requested in writing by the Designer. The Contractor shall <br /> provide the requested documentation within seven (7) days after receipt of the Designer's <br /> written request. The Schedule of Values shall be subject to approval by the Owner, and if the <br /> Owner and the Contractor cannot agree upon the Schedule of Values, the Designer shall <br /> prepare it, and the Schedule of Values as prepared by the Designer shall be binding on the <br /> Owner and the Contractor. No Request for Payment shall be certified by the Designer until the <br /> Designer has issued approval of said Schedule of Values. <br /> 20.2 Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the <br /> Designer a Request for Payment for Work done during the previous calendar month. The <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.