Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 35 <br /> The Contractor shall provide worksheets or tabulations describing the method by which the <br /> direct net cost was calculated, and shall provide all data needed to support the calculation of the <br /> direct net cost, all in a form acceptable to the Owner. <br /> 15.5 Where the Contract Price is to be adjusted by negotiation, the Owner may authorize and <br /> designate the Designer to negotiate with the Contractor on behalf of the Owner; provided, <br /> however, any agreement reached between the Contractor and Designer shall be subject to <br /> approval by the Owner. <br /> ARTICLE 16. UNFORESEEN CONDITIONS <br /> 16.1 Should the Contractor encounter unforeseen conditions at the Project site materially <br /> differing from those shown on the Drawings or indicated in the Specifications or differing <br /> materially from those ordinarily encountered and generally recognized as inherent in work of the <br /> character provided for in this Agreement, the Contractor shall immediately, and in no event <br /> more than three days later, give notice to the Owner of such conditions before they are <br /> disturbed. The Owner and the Designer shall thereupon promptly investigate the conditions and <br /> if they find that they materially differ from those shown on the Drawings or indicated in the <br /> Specifications, they shall at once make such changes in the Drawings and/or Specifications as <br /> they may find necessary. Any increase or decrease in the Contract Price resulting from such <br /> changes shall be adjusted in the manner provided herein for adjustments as to extra and/or <br /> additional Work and changes. However, neither the Owner nor the Designer shall be liable or <br /> responsible for additional work, costs, or changes to the Work that could have been reasonably <br /> determined from any reports, surveys, and analyses made available for the Contractor's review <br /> or that could have been discovered by the Contractor through the performance of its obligations <br /> pursuant to the Contract Documents. <br /> ARTICLE 17. CORRECTION OF WORK BEFORE FINAL PAYMENT <br /> 17.1 The Owner has the authority to stop or suspend work, and the Designer has the authority <br /> to order Work removed or to order corrections of defective Work or Work not in compliance with <br /> the Contract Documents where such action may be necessary to ensure successful completion <br /> of the Work. <br /> Any work, materials, fabricated items, or other parts of the Work which have been found by the <br /> Designer to be defective or not in accordance with the Contract Documents shall be condemned <br /> and shall be removed from the Project by the Contractor, and immediately replaced by new <br /> Work in accordance with the Contract Documents at no additional cost to the Owner. Work or <br /> property of the Owner or others damaged or destroyed by virtue of such condemned Work shall <br /> be made good at the expense of the Contractor. Correction of condemned Work described <br /> above shall be commenced by the Contractor within twenty-four (24) hours after notice from the <br /> Designer or the Owner and shall be pursued to completion. Should the Contractor fail to <br /> proceed reasonably with the abovementioned corrections, the Owner may, three (3) days after <br /> the notice specified in the preceding sentence, proceed with correction, paying the cost, <br /> including costs of uncovering such condemned Work, of such corrections from amounts due or <br /> to become due to the Contractor. <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.