Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 33 <br /> of the surety's consent to the Change Order has been furnished to the Designer and to the <br /> Owner, and the furnishing of such written consent is a condition precedent to such payment. <br /> 14.8 The Contractor shall support all requests for Change Orders with a detailed cost <br /> breakdown showing cost of materials, labor, equipment, transportation, other items, Contractor's <br /> overhead and profit, and total cost, in accordance with methods defined in this Article, and, if the <br /> request seeks an extension of the Contract Time, with a time-related diagram which <br /> demonstrates specifically why an increase in construction time is needed. <br /> 14.9 When a request for a Change Order involves a Subcontractor, the Contractor shall provide <br /> quotation from same on Subcontractor's letterhead. The Subcontractor's quote shall list <br /> materials, equipment, and labor separately, and show overhead and profit in the manner <br /> provided in paragraph 14.8. <br /> ARTICLE 15. CHANGE OF THE CONTRACT PRICE <br /> 15.1 The Contract Price constitutes the total compensation payable to the Contractor for <br /> performing all Work under the Contract Documents. All duties, responsibilities, and obligations <br /> assigned to or undertaken by the Contractor shall be at his expense without change in the <br /> Contract Price. The Contract Price may only be changed by a Change Order. <br /> 15.2 Any claim for an adjustment in the Contract Price shall be in writing and written notice of <br /> any event, action, or non-action which may become the basis of a claim shall be delivered to the <br /> Owner and the Designer within three (3) days of the occurrence of any such event, action or <br /> non-action giving rise to the claim. Such written notice is a condition precedent to the making of <br /> a claim, and such notice shall describe the basis of the potential claim with reasonable detail <br /> and clarity. <br /> A claim shall be made in writing and shall be delivered to the Designer and the Owner no later <br /> than fourteen (14) days after such notice. The claim shall describe in detail the basis for the <br /> claim, with specific reference to any provisions of the Contract Documents, by paragraph, <br /> drawing number, or other specific identification, and shall state the amount claimed and how it is <br /> calculated. If the Contractor, at the time the claim is made, is unable to state the amount <br /> claimed with accuracy, the Contractor shall so state and provide the estimated amount and the <br /> basis on which the amount is to be calculated. At the earliest date practicable, but in no event <br /> more than thirty (30) days after Contractor's notice of claim, the Contractor shall supplement the <br /> claim with an accurate statement of the amount claimed and how it has been calculated. The <br /> Contractor shall provide, in writing, in support of the claim all such explanations, arguments, <br /> data, receipts, expert opinions, or other documents or information as the Contractor deems <br /> appropriate to be considered in support of the claim. <br /> A claim may properly be rejected by the Owner by reason of the Contractor's failure to submit <br /> adequate or accurate documentation or information, except that within seven (7) days after <br /> being given notice that the claim has been rejected on this basis, the Contractor may submit <br /> additional documentation or information. No claim for a change of the Contract Price shall be <br /> considered or granted (except solely at the discretion of the Owner) unless a claim is so made, <br /> nor shall the Contractor be entitled to any increase in the Contract Price unless the Contractor <br /> has given notice and made such a written claim within the times required. The Owner shall <br /> decide, after obtaining the advice of the <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.