Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 26 <br /> a) Prior to acceptance of the Work by the Owner, the Contractor shall remove and replace any <br /> part of the permanent building systems damaged through use during construction. <br /> b) Temporary filters shall be installed in each of the heating and air conditioning units, return air <br /> grilles, and other locations to prevent intrusion of dust, dirt, and debris during construction. <br /> Temporary filters shall be removed and replaced with new filters immediately prior to Substantial <br /> Completion. <br /> c) Extra effort shall be maintained to keep the building clean and under no circumstances shall <br /> air systems be operated if finishing operations are creating dust in excess of what would be <br /> considered normal if the building were occupied. <br /> d)When the permanent lighting system is used during construction, lamps shall be replaced <br /> and shall be new on the date of Substantial Completion. <br /> ARTICLE 8. OWNER <br /> 8.1 The Owner shall issue communications and notices to the Contractor through the Designer <br /> to the extent contemplated by the Contract Documents. <br /> 8.2 In case of termination of the employment of the Designer, the Owner shall appoint as <br /> Designer a qualified person who shall have and assume all rights and duties held by the original <br /> Designer. <br /> 8.3 The Owner shall have the right to take possession of and use any portion of the Work <br /> notwithstanding the fact that the time for completion of such portion of the Work may not have <br /> expired, but such taking possession and use shall not be deemed an acceptance of any Work <br /> not completed in accordance with the Contract Documents. <br /> 8.4 A waiver on the part of the Owner of any breach of any part of the Contractor shall not be <br /> held to be a waiver of any other or subsequent breach. <br /> 8.5 The Owner shall pay all permanent acreage fees, governmental impact fees, and meter <br /> deposits for permanent utilities. <br /> ARTICLE 9. CONSTRUCTION MANAGER <br /> 9.1 The Owner may employ one or more Construction Managers for the purpose of assisting the <br /> Owner, Designer, and Contractor in developing and administering budgets and cost controls, in <br /> evaluating constructability and value engineering proposals, in establishing and maintaining a <br /> critical path method (CPM) schedule, in coordinating and/or expediting the Work with other <br /> projects being constructed by the Owner or others adjacent or near the Work, or for such other <br /> purposes as the Owner may deem appropriate. From time to time the Owner may identify such <br /> Construction Managers(s) to the Contractor in writing identifying any tasks assigned to such <br /> Construction Managers(s). <br /> ARTICLE 10. DESIGNER <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.