Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> 14 <br /> The Contractor is responsible for all physical damage to owned or rented machinery, tools, <br /> equipment, forms, and other items owned, rented or used by the Contractor and/or <br /> Subcontractor(s) in the performance of the Work including all of Owner's property in <br /> Contractor's care, custody, or control, and all such property while it is in transit. The insurance <br /> coverage evidencing such shall include a waiver of subrogation in favor of the Owner. <br /> 5.1.7 Valuable Papers and Records <br /> The Contractor shall provide valuable papers and records insurance with coverage in an <br /> amount commensurate with project scope and set forth in the Supplementary General <br /> Conditions. <br /> 5.1.8 Claims <br /> The Contractor shall notify the Owner within 24 hours of any claims or alleged claims received <br /> by the Contractor covered by any of the policies of insurance required in this Agreement. The <br /> Contractor shall provide a written copy of the claim or alleged claim to the Owner within 3 days <br /> of the Contractor's receipt of the claim or alleged claim. If a claim is settled to the satisfaction of <br /> the claimant, the Contractor shall submit a copy of the claimant's release to the Owner. If a <br /> claim or alleged claim is rejected by the Contractor and/or its insurance company, the <br /> Contractor shall immediately report this fact to the Owner. <br /> Should 30 days elapse after the claim or alleged claim has been received by the Contractor, <br /> and the Contractor is not able to report a settlement or rejection of the claim, it shall report to the <br /> Owner the steps being taken with respect to the claim. Without limiting the foregoing, the <br /> Contractor shall notify in writing the county risk manager of any paid or incurred claims which <br /> may impair annual aggregate or general liability. <br /> 5.1.9 Deductibles and Self-insured Retentions <br /> Any deductibles or self-insured retentions must be declared to and approved by the Owner. At <br /> the option of the Owner, either: a) the insurer shall reduce to a maximum of$250,000 or <br /> eliminate such deductibles or self-insured retentions with respect to the Owner, or (b) the <br /> Contractor shall provide evidence of collateral provided to insurers or procure a bond <br /> guaranteeing payment of losses and related investigations, claim administration, and defense <br /> expenses within the deductible or self-insured retention amount. Any self-insured retention or <br /> deductible amount on the policy shall not reduce the amount of collectible limits or liability. <br /> 5.1.10 Subcontractors <br /> The Contractor shall include all Subcontractors as Insureds under its policies, or shall furnish <br /> separate certificates, policies, and endorsements for each Subcontractor the Contractor intends <br /> to use. If a Subcontractor does not take out insurance in his own name and the Contractor <br /> wishes to provide insurance protection for such Subcontractor and such Subcontractor's <br /> employees, the Contractor shall either (a) procure appropriate policies in the name of the <br /> Subcontractor, or (b) cause a rider or riders to be attached to the Contractor's policies which <br /> shall identify the Subcontractor thereby covered; provided, however, in the case of the latter <br /> option, such a rider need not be attached to the Contractor's workers' compensation policy if <br /> such policy by its terms is sufficiently broad to cover the employees of all Subcontractors <br /> performing Work under the Contract Documents. Except as otherwise approved by the Owner in <br /> writing, Limits of Liability and coverage scope must be at a minimum as stringent as required of <br /> the Contractor by the Contract Documents. All Work performed for the Contractor by any <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.