Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1B4F92C62C <br /> The owner will: <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> C. At least ten(10) days prior to the scheduled day of bid opening, the Owner will <br /> notify certified MBEs of potential contracting opportunities listed in the proposal. <br /> The notification will include the following: <br /> 1. A description of the work for which the bid is being solicited. <br /> 2. The date, time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance, licenses, <br /> bonds and financial arrangements. <br /> If there are more than three (3) certified MBEs in the general locality of the project who <br /> offer similar contracting or subcontracting services in the specific trade, the Owner shall <br /> notify three (3) , but may contact more, if the Owner so desires. <br /> d. Maintain documentation of any contacts, correspondence, or conversations with <br /> MBE firms made in an attempt to meet the goals. <br /> 2. Prime Contractor <br /> Under the single prime contract system, the prime contractor will: <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> C. At least ten(10) days prior to the scheduled day of bid opening, notify certified <br /> MBEs of potential contracting opportunities listed in the proposal. The <br /> notification will include the following: <br /> 1. A description of the work for which the bid is being solicited. <br /> 2. The date, time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance, licenses, <br /> bonds and financial arrangements. <br /> If there are more than three (3) certified MBEs in the general locality of the project who <br /> offer similar contracting or subcontracting services in the specific trade, the Contractor <br /> shall notify three (3) , but may contact more, if the Contractor so desires. <br /> d. During the bidding process, comply with the contractor(s) requirements listed in <br /> the proposal for minority participation. <br /> e. Submit with the bid a description of that portion of the work to be executed by <br /> MBEs expressed as a percentage of the total price. <br /> f. Identify the MBEs the bidder intends to use on the contract, along with the dollar <br /> amount of the work to be performed by each minority business. <br /> g. Submit an affidavit that details the good faith efforts taken to procure minority <br /> business participation. <br /> h. Upon being named the apparent low bidder, the bidder shall provide the necessary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.