Orange County NC Website
DocuSign Envelope ID: EEC95C86-425F-4B19-8B7B-D793E7A74AE5 <br /> H. M. Kern Corporation PCO-06 5/21/2018 <br /> ,Job#879 Jerry Passmore Center <br /> Wall Hydrant 668-3213(p <br /> 668-2142(f) <br /> Phase Description gy# unit unit I Amount <br /> Labor: <br /> 20110 COORDINATION 2 HRS 35.00 70 <br /> 0. 0.00 0 <br /> 0 0.00. 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Labor 70 <br /> Materials: <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00. 0 <br /> 0. 0.00 0 <br /> 0. 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0- 0.00 0 <br /> 0 0.00 0 <br /> Total Materials 0 <br /> Equipment: <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0. 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Equipment 0 <br /> Subcontractors: <br /> 41500 JC PIEDMONT PLUMBING (ADD HOSE BIB) 1 LS 484.93 485 <br /> 41500 JC PIEDMONT PLUMBING (CREDIT DEMO) 1 LS -100.00 -100 <br /> 41500 JC PIEDMONT PLUMBING (ICE MAKER BOX) 1 LS 100.00 100 <br /> 41600 C S James Ele 1 LS 150.00 150 <br /> 0. 0.00 0 <br /> Total Subcontractors 635 <br /> Total Labor, Materials & Equipment 70 <br /> Sales Tax (Materials& Equipment) 6.75% 0 <br /> 29160 Labor Burden 40% 28 <br /> Subtotal 98 <br /> 89800 OH & Profit (Labor, Materials & Equipment) 10% 10 <br /> Total Subcontractors 635 <br /> 89800 OH & Profit (Subcontractors) 10% 64 <br /> Subtotal 807 <br /> 62050 Performance& Payment Bond 2% 19 <br /> Total Proposed Change Order $826 <br /> Page 1 <br />