Orange County NC Website
13 <br /> Board of Elections Water Mitigation Scope of Work Descriptions&Details <br /> 8. During the remediation all of the attic walls, and existing insulation was removed. This allowed <br /> the brick chimneys to be exposed to the interior of the attic. The chimneys currently need to be <br /> repointed due to water entering through the bricks. Currently the insulation installed needs to be <br /> removed and replaced. The area must be cleaned to remove any mold growth from the water <br /> intrusion around all four chimneys. <br /> 9. Sealing of basement doors and installing new maintenance access door <br /> 10. Cleaning of data cabling to remove unused cables and securing existing cables. <br /> Construction Costs: <br /> HVAC Controls, Programming, Additional Unit, temporary units 155,000 <br /> Clean out interior drains in basement 1,313 <br /> Moisture Barrier/Humidifers 24,394 <br /> Stairwell removal and install floor 10,434 <br /> Remediation at each Chimney 1,466 <br /> Chimney Repairs 30,200 <br /> Replace windows NTE 105,000 <br /> Replace carpet, seal basement from first floor, abatement 61,969 <br /> Rework furniture for carpet installation &replace NTE 25,000 <br /> Rework and remove unused data cables from basement NTE 16,000 <br /> Seal Basement doors and install new higher access NTE 125,000 <br /> 555,776 <br />