Orange County NC Website
i <br />ttt WEST MAIN STREET <br />OnRNAM NORTH CAROLINA 2]]Ot <br />p9t9 G02 0368 fet9.G66 5646 <br />Flanninc~ for the future <br />Date: 12/7/04 <br />BUCICHORN ECONOMIC DEVELOPMENT DISTRICT <br />AND <br />CENTRAL EFLAND <br />ENGINEERING COSTS <br />h Buckhorn Economic District (Plans and Specifications) <br />Core $1,394,120.00 x .0775 = $ 108,044.00 <br />Optimum $ 221,040.00 x ..0775 = $ 17, 131..00 <br />Ih Central Efland Area (Plans and Specifications) <br />Core $],762,400,00 x ..0775= $ 136,586.00 <br />Optimum $ 480,500.00 x ..0775 = $ 37.239.00 <br />Subtotal --------___ __~_-.~_______. .~ $ 299,000.00 <br />(Engineering Fee Throu gh Recommendation of Award of Contra ctor to Orange County) <br />III. Additional Engineering Services <br />• Buckhorn Economic District Utility Study ---------_____--_ ____- $ 18,000.00 <br />• Environmental Assessment (For Grant)------------~_____ ___.___ $ 25,000.00 <br />• Preliminary Engineering Report -----------_-_____.______ __-__ g 22,500.00 <br />• Surveying Easements Plats--------------______-________ ______ $ 20,000.00 <br />• Construction Phase Services--------------~_____~___-_- ____- g 99,890.00 <br />• Geotechnical and Materials Testing ---------_--______- _______ S Reimbursable Cost <br />• Printing and Advertising---------------________-_____-__ _____ g Reimbursable Cost <br />TOTAL ENGINEERING COSTS -----------_________-___ _-__- $ 484,390,00 Plus <br /> Reimbursable Costs <br />SUMMARY <br />Items I, II and l11 represent anticipated engineering costs associated with the Buckhorn Economic District / <br />Central Efland Project. <br />E N G I N E E R I N G P L A N N I N G <br />L A N G S C A P E A R C H I T E C T U R E <br />