Browse
Search
Agenda - 03-19-2019 8-h - Adoption of a Prequalification Policy for Contractors
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 03-19-19 Regular Meeting
>
Agenda - 03-19-2019 8-h - Adoption of a Prequalification Policy for Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 4:38:06 PM
Creation date
3/14/2019 4:24:57 PM
Metadata
Fields
Template:
BOCC
Date
3/19/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda - 03-19-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
Minutes 03-19-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Attachment 2 <br /> Prequalification Ratings Matrix for First-Tier Subcontractors under CM @ Risk <br /> Project Name: Orange County Northern Campus <br /> Bid Package No./Description: <br /> 1 2 3 4 5 6 7 8 <br /> Yes or N/A=1 E E E E E E E E <br /> point for z z z z z z z z <br /> acceptance <br /> and No=0 <br /> points for not <br /> `o `o `o `o `o `o `o `o <br /> accent—, u u u u u u u u <br /> Part A Section# Description Yes or No Pts Pts Pts Pts Pts Pts Pts Pts <br /> Part A-1.GENERAL COMPANY INFORMATION Yes or No <br /> Part A-2.BUSINESS TYPE Yes or No <br /> Part A-3.LICENSING INFORMATION Yes or No <br /> Part A-4.TYPE OF SCOPE OF WORK/AVERAGE SIZE/LARGEST PROJECT Yes or No <br /> Part A-5.SIZE OF COMPANY Yes or No <br /> Part A-6.CURRENT WORKLOAD Yes or No <br /> Part A-7.CURRENT WORKLOAD Yes or No <br /> Part A-S.LITIGATIONS AND CLAIMS Yes or No <br /> Part A-9.HUB OR DIVERSITY PLAN <br /> Part A-SUPPLEMENTAL INFORMATION <br /> Audited Financials Yes or No <br /> Bonding Company Letter Yes or No <br /> Current Insurance Ceni ica meeting OC-15 Article 34 Yes or No <br /> Letter from Insurance Company rtating EMR Yes Or No <br /> OSHA 3W Reports Yes or No <br /> Copy of HUB Certifcation,if claimed in Secton 2 Yes Or No <br /> Copy of Licenses for Specific work,if requ fired in S,dion 3 Yes or No <br /> Part A Acceptance=Subtotal 15 out of 15 points <br /> Part B Section# Description Yes or No Pts Pts Pts Pts Pts Pts Pts Pts <br /> Part B-1.INFORMATION <br /> Part B-2.UPDATED COMPANY INFORMATION <br /> 2a Current Backlog and Bond ing Ca p-ty Avail,ble Yes or No <br /> 21,Attach bonding letter from Surety,If over$300k Yes or No <br /> 2C List of Projects—king With CMAR in last 5 yea rs Yes or No <br /> Part B-3.PROJECT SPECIFICS <br /> 3a Assigned Superintendent resume and experience Yes Or No <br /> 3b Relevant project experience of assigned Superintendent Yes Or No <br /> 3C Assigned Project Manager resume and experience Yes or No <br /> 3d Relevant project experience of assigned Project Manager Yes Or No <br /> 3e Related Project Experience Yes or No <br /> 3f.1 Available Craftsman for Trade Prequalifying for Yes or No <br /> 3f.1 Self performance for Trade Prequalifying for Yes or No <br /> Part B Acceptance=Subtotal 10 out of 10 points <br /> TOTAL POINTS=25 points out of 25 points <br /> All scores of 25 points will be prequalified. <br /> note;if an item is not applicable("n/a'),then the CMAR shall make the line"n/a"for all subcontractors seeking prequalification for that bid package <br />
The URL can be used to link to this page
Your browser does not support the video tag.