Browse
Search
Agenda - 03-19-2019 8-d - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2019 Annual Technical Advisory Committee Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 03-19-19
>
Agenda - 03-19-2019 8-d - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2019 Annual Technical Advisory Committee Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 4:41:47 PM
Creation date
3/14/2019 4:03:50 PM
Metadata
Fields
Template:
BOCC
Date
3/19/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Section I <br /> B. Building Capacity and Membership <br /> 1. Responsible Entity for Suggesting Change—The Planning Directors, School <br /> Representatives, and Technical Advisory Committee (SAPFOTAC)will receive requested <br /> changes that are CIP related and adopted in the prior year. CIP capacity changes will be <br /> updated along with actual membership received in November of each year. Other changes <br /> will be sent to a `Joint Action Committee' of the BOCC and Board of Education, as noted in <br /> the MOU, who will make recommendations and forward changes (on the specific forms with <br /> justification) to the full Board of County Commissioners for review and action. These non- <br /> CIP changes would be updated in the upcoming November CAPS system recalibration and <br /> included in the SAPFOTAC report. <br /> 2. Definition — "For purposes of this Memorandum, "building capacity" will be determined by <br /> reference to State guidelines and the School District guidelines (consistent with CIP School <br /> Construction Guidelines/policies developed by the School District and the Board of County <br /> Commissioners) and will be determined by a joint action of the School Board and the Orange <br /> County Board of Commissioners. As used herein the term "building capacity" refers to <br /> permanent buildings. Mobile classrooms and other temporary student accommodating <br /> classroom spaces are not permanent buildings and may not be counted in determining the <br /> school districts building capacity." <br /> 3. Standard for: Standard for: <br /> Chapel Hill/Carrboro School District Orange County School District <br /> The original certified capacity for each of the The original certified capacity for each of the <br /> schools was certified by the respective schools was certified by the respective <br /> superintendent and incorporated in the superintendent and incorporated in the <br /> initialization of the CAPS system (Chapel Hill initialization of the CAPS system(Orange County <br /> Carrboro School District April 29, 2002 - Base) School District April 30, 2002 - Base) <br /> Capacity changes were made each year as follows: Capacity changes were made each year as follows: <br /> 2003: Increase of 619 at Rashkis Elementary. 2003: No net increase in capacity at Elementary <br /> 2004: No changes at Elementary, Middle, or High level. No changes at Middle School level. <br /> School levels. Increase of 1,000 at Cedar Ridge High School. <br /> 2005: No changes at Elementary, Middle, or High 2004: No net increase in capacity at Elementary <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.