Browse
Search
ORD-2012-048 Bid Award - Buckhorn Mebane Phase 2 and Approval of Budget Amendment #3-C
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2012
>
ORD-2012-048 Bid Award - Buckhorn Mebane Phase 2 and Approval of Budget Amendment #3-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 9:16:26 AM
Creation date
3/13/2019 9:15:04 AM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Agenda - 11-08-2012 - 7c
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 11-08-2012 - Regular Mtg.
Minutes 11-08-2012
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> C. For all Work, at the prices stated in Contractor's Bid, attached hereto as an exhibit. <br /> ARTICLE 6-PAYMENT PROCEDURES <br /> 6.01 Submittal and Processing of Payments <br /> A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. <br /> Applications for Payment will be processed by Engineer as provided in the General Conditions. <br /> 6.02 Progress Payments;Retainage <br /> A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for <br /> Payment on or about the 10th day of each month during performance of the Work as provided in Paragraphs <br /> 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established as provided <br /> in Paragraph 2.07.A of the General Conditions(and in the case of Unit Price Work based on the number of units <br /> completed)or, in the event there is no schedule of values, as provided in the General Requirements: <br /> 1. Prior to Substantial Completion,progress payments will be made in an amount equal to the percentage indicated <br /> below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may <br /> determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph <br /> 14.02 of the General Conditions: <br /> a. 5%percent of Work completed(with the balance being retainage). If the Work has been 50 percent <br /> completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to <br /> Owner and Engineer, Owner,on recommendation of Engineer,may determine that as long as the character <br /> and progress of the Work remain satisfactory to them,there will be no additional retainage; and <br /> b. 5%percent of cost of materials and equipment not incorporated in the Work(with the balance being <br /> retainage). <br /> 6.03 Final Payment <br /> A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, <br /> Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph <br /> 14.07. <br /> ARTICLE 7-INTEREST <br /> 7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of <br /> L5% percent per annum. <br /> ARTICLE 8—CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce Owner to enter into this Agreement Contractor makes the following representations: <br /> A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the <br /> Bidding Documents. <br /> B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions <br /> that may affect cost,progress, and performance of the Work. <br /> C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, <br /> progress, and performance of the Work. <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00520-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.