Browse
Search
Agenda - 05-23-2005-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-23-2005
>
Agenda - 05-23-2005-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:26:51 PM
Creation date
8/29/2008 10:26:52 AM
Metadata
Fields
Template:
BOCC
Date
5/23/2005
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20050523
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
ORD-2005-024 - Orange County Flood Damage Prevention Ordinance Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />2. Floodplain Development Permit Data Requirement. <br />To document compliance with the Flood Damage Prevention Ordinance, <br />permit applicants shall provide the following information at a minimum on the <br />floodplain development permit. <br />a. Descriptions of the development under the floodplain development permit <br />issuance, <br />b, The SFHA determination for the proposed development per available <br />data. <br />c. The regulatory flood protection elevation required for the reference level <br />and all attendant utilities, <br />d, The regulatory flood protection elevation required for the protection of all <br />public utilities, <br />e. All certification submittal requirements with timelines, <br />f. A statement that no fill material shall encroach into the floodway or non- <br />encroachment area of any watercourse, if applicable. <br />g, Specify the minimum foundation opening requirements <br />h, State limitations of below BFE enclosure uses (if applicable) such as, <br />parking, building access and limited storage only), <br />3. Certification requirements <br />a. The permit requires an Elevation Certificate (FEMA Form 81-31) or Flood <br />Proofing Certificate (FEMA Form 81-65) after the reference level is <br />completed, Within twenty-one (21) calendar days of establishment of the <br />reference level elevation, or flood proofing, by whatever construction <br />means, whichever is applicable, it shall be the duty of the permit holder to <br />submit to the Floodplain Administrator a certification of the elevation of the <br />reference level, or flood proofing elevation, whichever is applicable, in <br />relation to mean sea level, Said certification shall be prepared by, or <br />under the direct supervision of, a North Carolina licensed professional <br />land surveyor or professional engineer and certified by it, Any work done <br />within the twenty-one (21) day calendar period and before submission of <br />the certification shall be at the permit holder's risk. The floodplain <br />administrator shall review the certificate data submitted. The permit <br />holder shall correct any deficiencies detected by such review immediately <br />and before further work is permitted to proceed. Failure to submit the <br />certification or failure to make required corrections shall be cause to issue <br />a stop-work order for the project. <br />b. The permit requires a complete Final As-Built Elevafion Certificate (FEMA <br />Form 81-31) after construction is completed and before Certificate of <br />Compliance/Occupancy issuance. The permit holder shall submit to the <br />Floodplain Administrator a certification of final as-built construction of the <br />elevation of the reference level and all attendant utilities. Elevation <br />~,nq iu:ua-~.. ^i ui Im,~.i ~ sl;d II<.ii II,`i.idmn n .,,: o;L n^. Jv: <br />
The URL can be used to link to this page
Your browser does not support the video tag.