Browse
Search
2019-147-E AMS - Boomerang ES Change Request 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-147-E AMS - Boomerang ES Change Request 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 11:57:14 AM
Creation date
3/7/2019 9:27:29 AM
Metadata
Fields
Template:
Contract
Date
2/6/2019
Contract Starting Date
10/18/2018
Contract Ending Date
9/30/2019
Contract Document Type
Contract Amendment
Amount
$30,000.00
Document Relationships
2018-743-E AMS - Boomerang Design 510-Waters Assessment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2019-147 AMS - Boomerang ES Change Request 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2EB3A06B-5524-4E21-B639-AFB11OFDD324 <br /> Progressive Design Collaborative,Ltd <br /> Pd <br /> 3101 Popicvwood Court, Suite 320 <br /> Raleigh, North Carolina 27604 <br /> 919-790-9989 <br /> October 16, 2018 <br /> Ms. Angela Crawford, AIA <br /> Boomerang Design <br /> 6131 Falls of Neuse <br /> Raleigh, North Carolina 27609 <br /> Re: Orange County Emergency Services— Humidity Investigation <br /> Angie: <br /> Thank you for asking for Progressive Design Collaborative to work with you on studying the humidity <br /> issues at the existing facility. Based on our phone call this one will be hourly with a not to exceed- I am <br /> proposing the following services: <br /> Services: <br /> • Site visit by senior engineer to investigate existing conditions. 4 hours at $175/hour <br /> • Review existing drawings 4 hours at $1751hour <br /> ■ Run loads for the existing space 6 hours at $1251hour <br /> • Report of our findings and recommendations 6 hours at $1751hour <br /> • Rough construction budget with estimated construction duration 4 hours at $1751hour <br /> • Owner meeting 4 hours at $1751hour <br /> Design Fee: $4.600 <br /> If you have any questions, please give me a call. <br /> Sincerely, <br /> �S� '0 <br /> W <br /> Steve Campbell, P . <br /> PROGRESSIVE SIGN COLLABORATIVE, LTD. <br /> Attachment: PDC Hourly Rates <br /> - 7 - � 6 pdcengineers.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.