Browse
Search
Agenda - 12-06-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 12-06-2004
>
Agenda - 12-06-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 3:39:54 PM
Creation date
8/29/2008 10:26:48 AM
Metadata
Fields
Template:
BOCC
Date
12/6/2004
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20041206
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />In order to get a more accurate sense of the cost of building the facilities <br />proposed by the Work Group, in the spring of 2004 preliminary construction <br />estimates were prepared by a professional construction cost estimating firm. <br />Staff provided the 2003 design and a possible phasing plan (Attachment 2 -b) for <br />comparative purposes, in order to get a sense of costs by possible phase. <br />After reviewing the Master Plan, the cost estimating firm responded that <br />definitive estimates would not be possible until more - detailed drawings were <br />prepared, but based on their evaluation of the design (Attachment 2 -b), they <br />estimated the costs of building Twin Creeks Park by possible phase as follows: <br />Phase 1 $1,645,000 <br />Phases 1 -Athru 4 $3,375,000 <br />Total (all phases) $5,020,000 <br />The firm provided specific breakdowns of each proposed facility and other <br />associated costs (such as grading, roads and infrastructure). <br />It is important to note that these preliminary estimates are based on the 2003 <br />plan, and that two factors would tend to increase these estimates — 1) the <br />increases in construction costs of the last several months, and 2) the passage of <br />time since preparation. Town CUP application costs are also not included (as yet <br />The phasing plan that was used for the estimates is based on the 2003 version of <br />the plan (Attachment 2 -b). This potential phasing system was developed in the <br />winter and spring of 2004 by staff, with the goal of creating a minimal cost Phase <br />1 project, given the amount of available funds ($1.2 million) and the anticipated <br />need to defer some of the off -site and on -site infrastructure costs (roads, water <br />and sewer extension) to future phases to ensure adequate funds for some <br />playing fields in Phase 1. Because of increased construction costs, and the need <br />to build at least a segment of the parkway (the entry road from Old 86), it was <br />anticipated that only two fields could be built in Phase 1. The cost estimates tend <br />to confirm this, with a $450,000 projected shortfall for Phase 1, even with only <br />two fields. Since the Parkway would pass by the meadow, picnic shelter and a <br />loop trail to get to the lower two playing fields, these facilities were also proposed <br />to be included in Phase 1. <br />Staff has also completed a new phasing plan that identified a different Phase 1, <br />based on the "Alternative Scenario." This Phase 1 would still include two fields, a <br />picnic shelter and loop trails, but would also propose to pre -grade the remaining <br />areas of playing fields (shown as "Phase 1 -a "in Attachment 2 -d) to achieve <br />economies of scale. Rather than identifying phases 2, 3 and 4 at this time, this <br />phasing plan would leave the remainder of the park as "Future Phases" at this <br />time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.