in fall of 2007. There is some evidence that this timetable will be extended in response to <br />projections related to the School Adequate Public Facilities Ordinance. Additional <br />information would be available for Board consideration following the SAPFO - related <br />student membership projections later this year. CHCCS staff has indicated that the 2004- <br />14 system CIP includes $2,620,000 in an unfunded section of the plan to address <br />infrastructure improvements estimated for the Elementary School #10 site. This includes <br />funding for the planned connector road and water /sewer service, and the estimate was <br />developed based on conversations with OWASA, Town officials, and civil engineers. <br />CHCCS staff also notes that delivery of utilities to the school site may involve securing <br />easements from private property owners, and expenses for this process were included in <br />the estimate. <br />B. From July to September, staff members from ERCD, Recreation and Parks, Planning <br />and the County Engineer developed an "alternative scenario" master plan design, <br />focusing on smart growth design for the schools campus and increasing the opportunities <br />for sharing of facilities. The alternative scenario, along with the original master plan, is <br />provided in the attached memo. <br />C. An open house /public input session was held on October 4 at the Homestead <br />Community Center, and 12 persons attended the back -to -back one -hour sessions. <br />Response to the alternative scenario was generally favorable, and comments provided <br />by the attendees are provided as in the attached memo. <br />D. The County Engineer has prepared a memorandum outlining water and sewer issues for <br />the park site (attached). The cost of connecting the projected restroom /concession <br />facility (in proposed Phase 2) to OWASA sewer is estimated at $500,000, and extension <br />of water service from Old 86 is estimated at around $75,000. However, costs of line <br />extensions to serve the schools campus have not been calculated and could impact the <br />park site service plans and costs, as would other facilities in future phases, such as a <br />water playground. <br />E, Preliminary cost estimates for park construction, based on the 2003 design, were <br />prepared earlier this year and indicate a Phase estimate of $1.6 million and a total park <br />design (all phases) of around $5 million, However, increases in construction costs and <br />the new "alternative scenario" have not been factored into these estimates. A new <br />phasing plan, based on the "alternative scenario" design, has been prepared and is <br />included in the attached memo. An updated estimate for a revised Phase 1 could be <br />obtained by January. <br />F. Staff met with Chapel Hill Transit and Orange Public Transportation regarding possible <br />service to the site, and this information is also provided in the attached memorandum. <br />Generally, Chapel Hill Transit would look to a request from the Town of Carrboro and the <br />County before evaluating service to this site. Until such time as ridership meets Federal <br />guidelines for matching funds, service to this site would need to be funded by the <br />requesting local governments. There are currently no plans to provide service in this <br />area, although service to Lake Hogan Farms has been discussed. Orange Public <br />Transportation is currently in the midst of an updated Transportation Improvement <br />program, and if proposed changes to routes are made this could open up additional <br />areas for service, possible including the Twin Creeks site. <br />