Browse
Search
2019-140-E AMS - Harris Bros Electrical Link Lower Level renovation change order 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-140-E AMS - Harris Bros Electrical Link Lower Level renovation change order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 10:45:18 AM
Creation date
3/5/2019 9:59:54 AM
Metadata
Fields
Template:
Contract
Date
10/19/2018
Contract Starting Date
7/1/2018
Contract Document Type
Contract Amendment
Amount
$3,714.25
Document Relationships
2018-299-E AMS - Harris Bros Electric Lower Level Link
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2019-140 AMS - Harris Bros Electrical Link Lower Level renovation change order 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:33A8CB39-1737-4CB9-BD5A-1400159BE81 B <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> Asset Management Services <br /> Date: October 19, 2018 <br /> Project: Link Lower Level Renovations Change Order#1 <br /> This change order request involves the electrical services required to complete the renovations in the <br /> lower Level of the Link Building for the Public Defender and staff offices. <br /> The electrical contract was issued as a not to exceed $20,000.00. During the renovations, there were <br /> additional electrical outlets, lights and fans required to complete this renovation. <br /> This change order is to add an additional $3,714.25 to the existing contract for all services. <br /> Background: <br /> In July, 2018 Harris Brothers Electric & Controls, Inc. was issued an executed contract to perform the <br /> required electrical work for the lower level Link renovations. This contract was issued as a Not To <br /> Exceed contract of$20,000.00. <br /> The lower level Link Building renovations included installing new walls, lights, switches, outlets, fire <br /> alarm devices, IT equipment, HVAC equipment, and other misc. items to set up office space for the <br /> Public Defender and staff. <br /> P.O. Box 8181 * 131 West Margaret Lane,3rd Floor* Hillsborough, North Carolina 27278 <br /> Telephone:919 245-2625 <br /> Fax:919-644-3001 <br /> E-mail:AMService@orangecountync.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.