Browse
Search
2019-132-E AMS - Civil Consultants design services for Northern HSC driveway
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-132-E AMS - Civil Consultants design services for Northern HSC driveway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 10:23:37 AM
Creation date
3/5/2019 9:58:54 AM
Metadata
Fields
Template:
Contract
Date
2/27/2019
Contract Starting Date
3/1/2019
Contract Document Type
Agreement - Consulting
Amount
$14,500.00
Document Relationships
R 2019-132 AMS - Civil Consultants design services for Northern HSC driveway
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:466BC84F-2491-482F-9ECF-E665A2F18724 <br /> civi1consultants <br /> LAND DEVELOPMENT CONSULTANTS <br /> # 24032 <br /> PROPOSAL FOR CONSULTING ENGINEERING SERVICES <br /> Project: Additional Driveway Connection <br /> Orange County Northern Campus <br /> Hillsborough, NC <br /> Date: September 24, 2018 <br /> Client: Orange County <br /> Attn: Mr. Jeff Thompson <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Engineer: Civil Consultants, Inc. <br /> 3708 Lyckan Parkway <br /> Suite 201 <br /> Durham, NC 27707 <br /> General Description of Protect Work: <br /> The scope of work covered by this Agreement is as follows: <br /> 1. Design of a section of private driveway on the Orange County Northern Campus <br /> from the southeastern corner of the Detention Center, extending southwesterly <br /> across the stream and associated buffer, and connecting to West Hill Avenue. <br /> 2. Secure local approvals of the above, specifically related to driveway dimensions, <br /> grading, street tie-in, storm drainage, and stormwater management. No new <br /> stormwater management measure is included, as drainage from the additional <br /> pavement will be accommodated in the onsite wet pond to the extent practical, and <br /> otherwise allowed to freely drain without formal treatment. <br /> 3. Secure additional sediment and erosion control approvals from the State permitting <br /> agency for the above. <br /> 4. No utility connections will be made to utilities in West Hill Avenue. <br /> 5. Design the driveway to reasonably minimize impacts to the jurisdictional stream and <br /> stream buffer. Provide detailed impact maps, tabulations and justification to the <br /> permitting consultant (S&EC) for their use in preparing the permit packages to <br /> NCDENR and to the US Army Corps of Engineers. <br /> LAND PLANNERS + CIVIL ENGINEERS <br /> 3708 LYCKAN PARKWAY, SUITE 201 DURHAM, NC 27707, PHONE:919.490.1645 <br /> WWW.CIVIL—CONSULTANTS.COM LIC.C-1030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.