Browse
Search
Agenda - 03-07-2019 8-f Efland-Buckhorn-Mebane - Attachment
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 03-07-19 Regular Meeting
>
Agenda - 03-07-2019 8-f Efland-Buckhorn-Mebane - Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 4:53:23 PM
Creation date
3/4/2019 4:48:48 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Minutes 03-07-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Efland-Buckhorn-Mebane Access Management Plan <br /> # Description Source Response <br /> The intersection at Turner extension and Efland-Cedar Grove Road Inquired with NCOOT about any plan,projects,studies,etc.NCIIDT <br /> would better be suited with a roundabout rather than a T-intersection. Public requests Orange County conduct a Feasibility Study through the <br /> If Efland-Cedar Grove Road were to connect to Turner Street,it should Conversation MPO and determine the best solutions necessary to address <br /> curve into it allowing traffic to flow,similar to the other street curving increasing vehicle and freight traffic along the railroad cooridor in <br /> 9 into A. Efland. <br /> Will you take my property for these roads,will you compensate me for <br /> roads going through my property,will the County condemn my No.This is an unfunded Plan. Right-of-way dedication is to be <br /> 10 property for these roads? obtained through the development review process.The plan does <br /> not seek funding to buy property for these roads nor does it seek <br /> any authorization take any property forthem.The County is not in <br /> the road making business.This plan is a prerequsite necessary for <br /> legal standing so that the County may request property owners who <br /> seek to make changes to their property and submit a development <br /> application to dedicate some land for the public if necessary should a <br /> 11 Will County build these roads?When will these roads be built? August 28,2018 road be planned for their area. <br /> 12 Will any of the current roads be removed? Community No <br /> Meeting Gravely <br /> 13 So all existing roads will stay? Hill Middle Yes <br /> School <br /> Nothing in the subdivision.There will be a 100'buffer between the <br /> residential area and the surrounding large parcels should future <br /> development occur.We also want to make sure a road network <br /> through that development will be sufficient to address the increased <br /> traffic brought on by that new development.The entire network, <br /> once realized,could direct traffic directly to Buckhorn Road instead <br /> 14 What are you planning around the Preston Loop area? of West Ten Road. <br /> Can you tell us about the sewer and water infrastructure north of 1-95 <br /> and Buckhorn Road mainly for several residents there that are not tied There is an agreement in place forthat area's connection to <br /> 15 to any lines even though they should be? Mebane's water and sewer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.