Orange County NC Website
Efland-Buckhorn-Mebane Access Management Plan <br /> Answer: As development occurs.There is no horizon or set year when this transportation network will be <br /> realized. Even since the 2011 E-B-M AMP, only one road, the one to Morinaga, has actually been <br /> constructed. <br /> Question: Why do you have a road cutting through the residents along Center Street? <br /> Answer: This is part of the planned Turner Street which calls for a 50' right of way and extends it Ben <br /> Johnston Road. It is the current right of way still in existence passed on from the original owner. <br /> We are studying how to address the growing traffic in the area; especially should the large <br /> property east of the neighborhood be fully developed. <br /> Question: When will Mebane expand into this area with all its growth? <br /> Answer: The western portion of the planning area,to Buckhorn road, is seen as how far the city will grow. <br /> However,the city cannot annex the area on its own. Developers and property owners must <br /> petition to annex into the city due to changes in state law. <br />