Browse
Search
Agenda - 03-07-2019 8-f Efland-Buckhorn-Mebane - Attachment
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 03-07-19 Regular Meeting
>
Agenda - 03-07-2019 8-f Efland-Buckhorn-Mebane - Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 4:53:23 PM
Creation date
3/4/2019 4:48:48 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Minutes 03-07-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Efland-Buckhorn-Mebane Access Management Plan <br /> It is easy to place a blue dot in this location and hold it out as an area for future study, but it has <br /> implications for any landowner surrounding it. This area is one of the few locations in the "Efland Area <br /> Commercial Industrial Node"that has bath water and sewer. To designate it an area of"Future Analysis <br /> Required"would have negative implications for any potential buyer because no one in the Planning <br /> department would be able to define what the county would require for regulatory compliance or right- <br /> of-way designation. As such, it would eliminate anyone's interest in the area for purchase or <br /> development. <br /> We currently do not know of any long-range plans by either the NCDOT or Southern Railroad for any <br /> new intersection in the Efland area,and at the public information forum it was expressed that the <br /> County was not aware of any plans either. We also have heard in the past about Southern Railroads <br /> unwillingness to share information or co-ordinate with the county.We first heard this idea of an over- <br /> under-pass mentioned in 1978,which was 40 pears ago. It seems to reappear every few years as wishful <br /> thinking. For anyone who stands adjacent to the curve on Forrest Avenue and looks at the height <br /> required of a railroad overpass, and the distance to Hwy 70,it becomes apparent that the idea N not <br /> realistic and does not require"Future Analysis". For these reasons we think Orange County's resources <br /> would be much better allocated to serve the area by removing the western blue dot on EBM-AMP in <br /> Efland and developing a plan with NCDOT to connect Hwy70 to the interstate in bath directions at the <br /> Hwy 70 Connector. This would also eliminate any required co-ordination with Southern Railroad for a <br /> new intersection. <br /> Lastly; I (Doug Efland) personally sat through an extended series of monthly meetings with the <br /> Planning Department during the development of separate zoning overlays for the north side of the <br /> railroad tracks vs the south side of the railroad tracks in Efland. The stated purpose of the two separate <br /> zoning overlays were to preserve the village character on the north side while the county was <br /> constructing infrastructure on the south side to accommodate development along the interstate <br /> corridor. During this process we worked together as a citizen group with the Planning Department,and <br /> wrestled with different height restrictions for buildings and signs on the north side vs the south side <br /> among other things. To even contemplate for"Future Analysis"the creation of a colossal geographic <br /> feature taller than any structures that would be allowable,and then placed in the heart of the Village of <br /> Efland negates any planning the County has previously put in place.This would permanently change the <br /> character of Efland. <br /> To reiterate,we think there should be increased thought about a two-way connection on the west <br /> side of the Hwy 70 connector and the removal of any verbiage or designation for consideration of any <br /> railroad over-under-pass from the Village of Efland's portion of the updated EBM-AMP. Weappreciate <br /> your time spent with us and your consideration of our concerns. <br /> Sincerely, <br /> Douglas Efland <br /> Donald Efland <br />
The URL can be used to link to this page
Your browser does not support the video tag.