Orange County NC Website
Efland-Buckhorn-Mebane Access Management Plan <br /> Refer to the 2017 Transportation Study for detail information on the planning area's LOS. It provides the <br /> engineering bases for requiring developers mitigate the traffic impact they will have on existing transportation <br /> network in accordance with the County's adopted 2030 Comprehensive Plan goals and objectives. <br /> C. Recommendations - Future Roadway and Intersection Improvements <br /> Based on the information presented in the 2017 Transportation Study and taking into account public comments, <br /> functional classification, design speed, traffic volumes, character and composition of traffic and type of right-of- <br /> way, the roadway network and intersection improvements are recommended on the following pages. <br /> In order to meet the goals and objectives identified on page 15, this AMP update recommends the following <br /> actions: <br /> • Require right-of-way dedication - based on the "Street Cross-Section Requirements" below - for all <br /> development throughout the Planning Area and acquire necessary easements for infrastructure <br /> improvements. <br /> • Work with NCDOT to pursue funding to advance the following improvements: <br /> o Install a traffic light at high frequency crash intersections to ensure safety for all users and assist <br /> traffic flow. <br /> o Install a crosswalk with a flashing light at key intersections in the planning area. <br /> • Consider a provision that any development having ingress/egress in the Planning Area either construct <br /> its fair share of recommended improvements or provide payment in lieu of such improvements. <br /> • Work with developers, the Orange County Economic Development Department, and Orange County <br /> Planning and Inspection Department to implement access management recommendations. <br /> • Identify and promote transportation projects in the planning area to respective planning organizations <br /> and NCDOT. <br /> • Pursue NCDOT SPOT Safety projects for key intersections throughout the planning area. <br /> • Support NCDOT's County Complete Street Policy, which was being updated at the time this Plan was <br /> prepared, to address multi-modal travel and protect pedestrian and bicycle circulation around <br /> residential subdivisions and commercial areas. <br /> • Take transit services into consideration as the E-B-M AMP is implemented. Currently, Orange County <br /> Public Transportation operates one route in the planning area called the Orange-Alamance route. <br /> Consideration will also be given to transit as additional routes are added. <br /> Street Cross-Section Requirements <br /> Many existing roads will no longer have the capacity to handle the projected 172,829 additional vehicular trips. <br /> New roads will have to be constructed while existing ones may require widening. Road design plays an <br /> important role in access management. Several road cross sections have been designed to help address increased <br /> traffic. This AMP update also takes into consideration bicycle and pedestrian requirements along the proposed <br /> cross sections as demonstrated below (FIGURES 13-20). <br /> Orange County Planning Department Page 16 <br />