Orange County NC Website
DocuSign Envelope ID:OB6A4D70-3138-422C-98BF-EA253C4BCA84 <br /> CleanHarbors, <br /> February 25, 2019 Page 4 of 5 <br /> Clean Harbors Quote #3134962 <br /> GENERAL CONDITIONS <br /> • This proposal is contingent on the customer providing full and complete access to the site. <br /> Customer represents and warrants to Clean Harbors that the customer has the legal right, title and <br /> interest necessary to provide access to the site. In addition, customer warrants that it has supplied <br /> Clean Harbors complete and accurate information regarding the site, subsurface conditions, <br /> utility locations, site ownership, hazardous materials or wastes and other substances or hazards <br /> likely to be present and any other reports, documentation or information concerning the scope of <br /> work. <br /> • Interest will be charged at 1.5% per month or the maximum allowed by law for all past due <br /> amounts. <br /> • Disposal will be managed within the Clean Harbors Network of Approved Facilities. <br /> • Local, state and federal fees/taxes applying to the generating location/receiving facilities are not <br /> included in disposal pricing and will be added to each invoice as applicable. <br /> • Materials subject to additional charges if they do not conform to the listed specifications. <br /> • Electronically submitted profiles will be approved at no charge. Paper profiles will be charged at <br /> $75.00 each. <br /> • Clean Harbors supports many invoice delivery options (E-mail, Electronic Invoicing, EDI, Etc.). <br /> Pricing is based on Clean Harbors' standard invoice delivery method of E-mail. If another <br /> delivery method is required there could be an additional service fee per invoice. Any alternate <br /> delivery methods must be reviewed and approved by Clean Harbors prior to acceptance and <br /> implementation. <br /> • A variable Recovery Fee (that fluctuates with the DOE national average diesel price), currently <br /> at 12.0%, will be applied to the total invoice excluding labor items. For more information <br /> regarding our recovery fee calculation please go to: www.cleanharbors.com/recoveryfee. <br /> • Pickups that require same day or next day service may be subject to additional charges. <br /> • Pickups cancelled within 72 hours of scheduling will be subject to cancellation charges. <br /> • Transportation charges to the final disposal facility will be charged in addition to local <br /> transportation to our truck to truck hub/local facility and will vary with logistics and routing. <br /> • Time over eight (8) hours in the normal workday and all day Saturday is considered overtime <br /> and will be billed at 1.5 times the applicable straight time rate for all billable personnel unless <br /> otherwise quoted. Sunday and Holidays are considered premium time and will be billed at 2.0 <br /> times the applicable straight time rate for all billable personnel unless otherwise quoted. <br /> • This proposal is submitted contingent upon the right to negotiate mutually acceptable contract <br /> terms and conditions, which are reflective of the work contemplated, and an equitable <br /> distribution of the risks involved therein. In the event that such agreement cannot be reached, <br /> Clean Harbors reserves the right to decline to enter into such an agreement without prejudice or <br /> penalty. <br /> • On June 30, 2018 the EPA activated the E-Manifest system. The EPA will charge the receiving <br /> TSDF a fee per manifest. To cover the cost of the E-Manifest, Clean Harbors will charge $10 per <br /> manifest on every invoice. <br /> 0"People and Technology Creating a Safer, Cleaner Environment" <br />