Orange County NC Website
DocuSign Envelope ID: EED1436F-A6DD-40E9-BE68-FFBF6AF84800 <br /> Engineers and Soil Scientists <br /> Agri-Waste Technology, Inc. <br /> 501 N. Salem Street, Suite 203 <br /> Apex, North Carolina 27502 <br /> 919-859-0669 <br /> www.agriwaste.com <br /> February 15,2019 <br /> PROPOSAL FOR SERVICES <br /> TO: Marabeth Carr, Landscape Architect <br /> Orange County Dept. of Environment/AgricuIture/Parks&Recreation <br /> FROM: Chris McGee, LSS <br /> Vice President—Soils&Environmental Testing <br /> SUBJECT: Proposal for On-Site Wastewater System Consulting Services— <br /> Blackwood Farm Park(Hillsborough,NC) <br /> Thank you for contacting Agri-Waste Technology, Inc(AWT)regarding your wastewater <br /> system needs. It is our understanding that a proposed master plan of this park indicates <br /> the need to utilize on-site wastewater(septic)systems in order to dispose of wastewater <br /> for multiple structures on the property. Based on our discussions with Ward Consulting <br /> Engineers, P.C.,we recommend a preliminary soils evaluation of the area outlined in <br /> Figure 1. (following this proposal) in addition to the other services outlined in the scope <br /> below. The purpose of this evaluation is to determine where suitable soils exist for <br /> various types of septic systems and allow flexibility in the placement of structures should <br /> plans change in the future. Since the Orange County Environmental Health Department <br /> has already conducted evaluations and issued septic permits,AWT can work with their <br /> staff in order to determine the best way to make adjustments to the site. <br /> The following steps are proposed under this scope: <br /> - Perform desk review of site/review existing permits and flow needs. <br /> Perform in-field soil evaluation borings(field work to be completed within 15 <br /> business days of work agreement signature). <br /> Develop summary map and report of suitable soil area(s). Generally, maps <br /> and reports are available within S business days of completion of field work. <br /> Provide general consulting on wastewater system sizing and requirements <br /> based on site findings. <br />