Browse
Search
Agenda 8-g - Request for Road Additions to the State Maintained Secondary Road System for Oak Crest Drive, Booth Road Extension, Ridge View Lane, and Cedar Run Lane in Oak Crest Subdivision
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 03-07-19
>
Agenda 8-g - Request for Road Additions to the State Maintained Secondary Road System for Oak Crest Drive, Booth Road Extension, Ridge View Lane, and Cedar Run Lane in Oak Crest Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 3:27:19 PM
Creation date
2/28/2019 3:19:25 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 03-07-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 03-07-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS FOR DOMPLE r l NG PE T I T I ON- <br /> 1_ Complete Information Section <br /> 2_ Warr y Contact Person (This person serves as spok-esperson for petliomr(s)) 9 <br /> 3. Attach two (2) copies of mw- rded subdivision plat or prnperty des, Whkh refer to candidate road_ <br /> 4. AdJoilning property own arOor the develops, May jjubmd a pe�lon. Subdiwision roads with prior <br /> NCDOT rie+riew and oppmal only requrre the developer's Sig nature- <br /> 5- tf submitted by the developer, encroaohi errt agreements from all ufiiifies located wgthin the right of <br /> war shall he submitted with the petition for Road addition. However. corti�tfUdiOn ptarlr, May not be <br /> feqWred at this timw <br /> . $r,brinil to V+stricl E n ine0s Office. <br /> FOR NCDOT USI=- ONE Y= Ptea5e Chuck the appropriate black <br /> ❑ Ku fal Road ❑ !� ubdivlsx3il platted prior La CMubur 1. 11375 N Subd IML%inn paste¢after Septerrrber 30, 197t <br /> REQUIREMENTS fOR AUDMON <br /> If this read meeb. the requirements necessary For addition, we agree to grant the Departrnent <br /> of Transportation a night—of—way of the necessary width to construct the road to the minimum <br /> construction standards of the NCDOT_ The right-of-way will extend the entire length of the <br /> road that is requestrbri to be added to tW state maintained system and wil I include the <br /> necessary areas outside of the right•or-way for nut and fill slams and drainage. Also, we <br /> agree to dedicate add itinn.al rig#it-of-way at intersections for sight distance and design <br /> purposres and execute said right-at-way agreement forms that will be submitted to us by <br /> representatives of the NC DOT_ The right-of-war shall be cleared at no expense to the <br /> N DOT, which includes the removal of utilitieas, fenGes, other obstructions, etc. <br /> General statute 1 M-7 V? .E} staffs that any subdivision recorded oil or after October 1, 1975, <br /> must be built in accordance with N ODOT standards in order to bp eli g ih le for r-ldd ition to the <br /> Slate road System. <br /> RX" NAME HOMES LENGTH ROAD NAME HOMES LENGTH <br /> Oak CTest Drive w 7 0_70 <br /> Ridgcview Lark 0.10 <br /> CecW Runt L 1*- (111.07 <br /> k � <br /> F nrm 1Id 9 f'i ANWi Iiwu IrAIIfl% <br />
The URL can be used to link to this page
Your browser does not support the video tag.