Browse
Search
2019-119-E Planning - Betty Compton SCS maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-119-E Planning - Betty Compton SCS maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 11:51:08 AM
Creation date
2/26/2019 11:46:26 AM
Metadata
Fields
Template:
Contract
Date
2/12/2019
Contract Starting Date
2/12/2019
Contract Ending Date
6/30/2019
Contract Document Type
Contract
Amount
$1,000.00
Document Relationships
R 2019-119 Planning - Betty Compton SCS maintenance
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2A37B9F6-9937-4A9B-84CC-F34AAB8A6D07 <br /> Attachment A <br /> Lake Orange Sediment Control Structure Mowing Specifications and Schedule <br /> Scope of Work: The dam, including the area around the outlet pipe and stilling pool, of each <br /> sediment structure should be mowed and cleared of woody vegetation twice per year. The general <br /> areas to be maintained are circled in the diagram below. The County has a maintenance easement <br /> for the ponds, as well as an access easement to reach the ponds from Compton Road, across the <br /> properties of Betty Compton and Dwight Compton, Jr. <br /> Work includes any lopper/handsaw/chainsaw work needed to remove woody vegetation in areas <br /> where a power mower cannot reach. This needs to occur once in the Spring (March-May) and once <br /> in early Fall (September-October). Half of the yearly contract amount may be billed for mowing done <br /> in the Spring and half may be billed for mowing done in the Fall. These two mowing/clearing jobs, up <br /> to the total amount of the contract, are the only work authorized by this contract. <br /> MAI <br /> v t f �� _.. �`. . <br /> A._' -.IT NiR <br /> �•• �t Y1 IP � IHitf <br /> N V <br /> LEF <br /> ri <br /> 77 <br /> Sediment Contrc. <br /> Structure No. 1 <br /> 7 <br /> T 5ealment Control <br /> Structure No. 2 <br /> Additional Work: If the Contractor believes other work above and beyond the scope of this contract <br /> needs to be done, e.g. cleaning the trash rack of the outlet, reseeding the dam, or other dam <br /> maintenance, this should be brought to the attention of the Engineering division of the Planning <br /> Department. If the Engineering division agrees that the work needs to be completed, the Contractor <br /> will provide a quote to perform the additional work. This quote must be approved in writing, either <br /> with a separate contract or a Purchase Order, before work commences. Orange County will not pay <br /> for any work done outside of this contract unless prior approval is received as outlined above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.